My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No. P 5882 Attestation No. P 5879 <br />nv[e, ca Kron r itnrria cn. r.nr Delgado <br />l g a d (1 ut uxnl'to.ana av <br />Kevin Graf .._..._ ,1uan <br />Walton Engineering Inc. _ <br />Walton Engineering Inc. <br />Attestation No. P 5878 <br />Jessie D. Andrada <br />Walton Engineering Inc. <br />d installation Training for EVIZ Phase I by O 'd Installation Training for EVR Phase i by 0 ed Installation Training for EVR Please I by 01 <br />Jn: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 1012/2012 <br />(ors training course does not create,? warranty or guaranty by OPW of your i )"this training course does not create a warranty or guar antyby OPiV of your, of this training course does not create a warranty or guarantyby OPFV or your it <br />mance of nozzles, vapor recovery systems and &R PHASE I _rystems. This Ir, tenance of nozzles, vapor reco, ery systems and EVR PHASE I systems. This tr ntenance a`nozz/es, vapor re every systems and EVR PH45E i systems. This tr <br />iot eliminate the need to strictly adhere to manufacturer instructions and proca not eliminate the need to strictly aoherc to ,^iani facturer instructions and proc s not eliminate the need to strictly adhere to manuracturer instructions and prose <br />maintaining noz leu, vapor recovery systems and EVR PHASE I Systems. All t I maintaining nozzles, vapor recovery systems and EVR PHASE 15 stenK. All, and maintaining nozzles, vapor recovery systeres and EVR PHASE Systems. Alin <br />y systems and EVR PHASE I Systems must be insla'led and maintained in acct 'r' systems and EVR PHASE I Systems must be installed and m3)rjaired In arc 'e%' systems and EVR PHASE I Systems must be installed and rnari)tained in acct <br />I- instructions and ocedures. Attestation, a er insYructons acrd prixedures. Attestation applies ONL Y to tested nanud indwic <br />instructions and procedures. Attestation apples CkVC Y to tested named indivv p' Ai+es Oh•L Y to tested named indivn <br />Attestation No. P 60C Attestation No. P 5871 - Attestation No. P 600,1 Gerardo Guzman Jr. Isaac Diaz Curtis Carpenter <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />A Installation Training for EVR Phase I by installation Training for EVR Phase I by OP 1 Installation Training for EVR Phase I by <br />On: 2/1/2011 Exp Date: 2/1/2013 n:10/2/2010 Exp Date: 10/2/2012 )n: 2/1/2011 Exp Date: 2/1/2013 <br />Ifthts trawing course dues not create a wamantyguaranty y or 6 Ol°w ayn this trwairng course dries not create a warranty or guaranty by OPW of your ins <br />mance of narzles, vapoi remvtYy systaris and EV <br />)ante of nozzles; vapor rem very systems and EVR PHASE I systems. T,ht's tram this trawling course do — not creat) a warranty or guaranty by OPW cV ynu, <br />R PHASEI systurzs. 771rs ,t eliminate the need to strictly adhere to manufacturer instructions and proceo nancL of noz2fes' vapor rem verysyst&w and EYR PHASE Isystems This <br />wt eliminate the need to sbxUy adhere to manufacturer Inst wbons and p maintaining nozzles; vapor recovery systems and EVR PH4SE I5ystems. All no -�t eliminate Me need tDpet <br />srixtly adhere In manufacturer trastrartiats acct <br />maintaining noales, vapor re<ovtury sy Stems and EVR PHASEI sysfens I sy teens and EVR PHASE i Systems must be installed and maintained in accon rMIntwnrng n=At s, vapor recomy systems and EVR PHASEI Sy5te s' AI <br />y systems and EVR PHASEISystrms must be Installed and manta rxd to a vstrlctions and procedures. Attestation applies ONL Y to tested named roll, du, r and EVR PHASEI Systems must be mstalW and maintained In ac <br />rstrtrcitons and prtxadures. Atte5tabon aAclAes Oft Yto tested named Ind wMnIdlons and prtreo'vres. Attestabon applies ONLYto tested narnsad lndri <br />Attestation No. P 5875 <br />Attestation No. P 5872 <br />Attestation No. P 5884 <br />Jimmy Hamblen <br />Steven Flores <br />David Delgado <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />d Installation Training for EVR Phase I b�' O d Install.1 Training for EVR Phase I by O >d Installation Training for EVR Phase I by OP <br />On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 <br />u -this training course does not Create a warranty or guaranty by OPI y of your , .f this learning course does not create a warranty or guaranty by OP M/ of your, If this training course docs not create a warranty or guaranty by OP of your in!tenance of nozzles, vapor remverysystems and tvR pH4_�F I systems, Thrs fro,', <br />enante benoz.:Ies, vapor recovery systems and EVR PHASE! systems. This tr. enance or nozzles, vapor recovery systems and EVR PHASE I systems. This a not eliminate the need to str,'ctly adhere to manufacturer instructions and rocec <br />not eliminate the need to strictly adhere to manuracturer instructions and proc not eliminate the need to strictly adhere to manuracturer Instructions and proc d maintaining nozzles: vapor recoverysystems and EVR PHASE Systems. Al,' nc <br />t maintaining nozzles, vapor recovery systems and EVR PHASE 15ystems. Allo f maintaining nozzles, vapor recoverysy stens and EVR PHASEI Systems. All <br />YY systems and EVR PHASE I S stenK must be installed and maintained in a�a r 'ry 5y5tenm5 and EIIR PHASE I Systems must be insta(ed and maintained in actor <br />Y �ry systems and EIIR PHASE I Systems must be installed and maintained in arc r instructions and prcces+ures. Attestation applies OM Yto tested named individu <br />nstructions and procedures. Attestation applies ONL Y to teased named indivit - instructions and procedures. Attestation applies ONLY to tested named tndiw; <br />
The URL can be used to link to this page
Your browser does not support the video tag.