My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No. P 5870 <br />P �1lV. P W_a <br />"�%�`^� Ryan Powell <br />Walton Engineering Inc. <br />Attestation No. P 5868 P Attestation No. P 5883 <br />VV <br />Michael Koenig, Jr. 1R,;H-co...,...r Michael Holkko <br />Walton Engineering Inc. Walton Engineering Inc. <br />d installation Training for EVR Phase I by O: (1 Installation Training for EVR Phase I by O_ �d Installation Training for t?VR Phase I by C) <br />)n: 10/2/2010 Exp Date: 10/2/2012 )n: 10/2/2010 Exp Date: 10/212012 On: 10/2/2010 Exp Date: 10/2/2012 <br />( this training course does not create a warranty or guaranty by OPVJ of ymrr i, f this training course does not create a warranty or guaranty by OPW of your i, ,f this training course does not create a warranty or guaranty by OR V of your <br />mance of nozztes, v,?por recovery Systems and EVR PHASE I systems. This tri mance of nozzles, vapor recovery systems and EVR PHASE I systems. This tri tenance vfnozz,'e4 vapor recovery systems and EVR PHASE I systems. This t <br />toeliminate <br />l iminaYe the need <br />dt strictly adhere to manufacturer instructions and prate lute li£a n (e the need to strictly adhere to manufacturer instructions and prose not eliminate the neer! to strictly adhere to manufacturer /rLsfruc-tion< and trot <br />g par recovery systems and EVR PHASE I Systems. Alit g nozzles, vapor recovery systems and EVR PHASE I Systems. All, ; maintaining nozzles, vapor re overy systems and EVR PHASE I Systems. All <br />y systems and Eb R PHASE! Systems must be installed and maintained in acct Y systems and fVR Pt{ASE I Systems mint be irstalJed and maintained ir. accz >ry systems and EVR PHASE i Systems must be installed and maintained in acc <br />instructions and procedures. Attestation appleeS ONL Y to tested named indivic instructions and procedures. Attestation apples ONLY to tested named indivic r instructions and procedures. Attestation applies GNC Y to tested named indica <br />Attestation No. P 5886 Attestation No. P 5876 <br />Michael Raymond Mauricio Miranda <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />Attestation No. P 5877 <br />Juan Jauregui <br />Walton Engineering Inc. <br />ed Installation Training for EVR Phase I by C 'cI installation Training for EVR Phase I by O .1 Installation `i'r-aining for EVR Phase 1 by OI <br />On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 )n: 101212010 Exp Date: 101212012 <br />of this training course does not create a warranty or guaranty by OPW of your If this tra;n;ng course does not cerate a warranty or guaranty by OPW of your , ether training course does not create a warranty or guaranty by OPW of your if <br />tenance of nozz,'es, vapor reQ7very systems and EVR PHASE I sys7ems. This t 'enance arnozzles, vapor recoverysystems and EVR PHASE I systems This tr »ante of nuzzles, vapor rem�cry systems and EVR PHASE J sys7ems. Ths t2 <br />not eliminate the need to strictly adhere to manufacturer instructions and pro not eliminate the need to strictly adhere to manufacturer instructions and pros of eliminate the need to strictly adhere to manufacturer instructions and moose <br />d maintaining nozjls, vapor recovery systems and EIrR PHA5E I Systems. Ale r maintaining nozz/ems vapor recovery sy stems and EVR PH45E I Systems. All, maintaining nozzies, vapor recovery systems avd EVR PHASE I Systems. All n <br />cry systems and EVR PHASE I Systems must be installed and maintained in ac rY SYSI encs and EVR PHASE 15},stems must be installed and maintained in aco y systems and EVR PHASE I Systems must be installed and maintained in accv <br />ir instruction <br />5 and procedures. Attestation applies ONL Y to tested named indiv ' inStrucbdns and procedures. Attestation applies ONLY to tested named indivh Instructions and procedures. Attestation applies ONL Y to tested named ind%vid <br />P v" Attestation No. P 5881 P V� Attestation No. P 5869 P Attestation No. P 600 <br />Darren Sciume"''"E"-��°"""' Jeff Powell Matthew Jensen <br />Walton Engineering Inc <br />Walton Engineering Inc. <br />Walton Engineering Inc. <br />td Installation Training for EVR Phase I by O ed Installation Training for EVI2 Phase I by C ,d Installation Training for EVR Phase I by <br />On: 10/2/2010 Exp Date: 10/2/2012 On: 10/2/2010 Exp Date: 10/2/2012 On: 2/1/2011 Exp Date: 2/1/2013 <br />7f this t. dining coarse does not create a warranty or guaranty Dy OPW of your of this training course does not create a warranty or guaranty by OPW of yore <br />tenance ofnozz/es, v?por recovery systems and EVR PHASE I systems This t, 7tenance of nozzles, vapor recovery systems and EVR PHASE I systems. ThisrfthLs tiamrng course does not mate° a warrantyarguarantyby OPIY of yti <br />not eliminate the need to strictly adhere to manufacturer instrextions and pros s not eliminate the need to strictly adhere to manufacturer instructons and prc finance cfnazes, vapor mcaw ysysfeaK and EVR PHA.SEI systelm The, <br />ma;ntaininq no rtes vapor recovery systems and EVR PHASE I Systems. All 7d maintatnmg nozztes, vapor recovery systems and EVR PHASE I Systems. Anal eliminate Me need to strictly adhere to mancda1vrer uesbrxb'ans and p <br />°ry systems and EVR PHASE I Systems must be installed and maintained in acc rery systems and EVR PHASE I Systems must be installed and maintained in ac I maintaining nates Vapor recovery Systeftrs and EVR PHASE I Systems. . <br />r mstructions and procedures Attestation applies ONL Y to tested named ;nd;n or instructons and procedures. Attestation applies ON, Y to resteo, named aid; i ry systems and EVR PNASEI Syrians must be Installed and maintained in e <br />r Instruction and prrxe lures, Attestation app9es ONL Y to tested named fno <br />
The URL can be used to link to this page
Your browser does not support the video tag.