My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
po Attestation No. P 5887 <br />Linda Steiger <br />Walton Engineering Inc. <br />d Installation Training for EVR Phase I by 01 <br />)n: 10/2/2010 Exp Date: 10/2/2012 <br />`this training course does not create a irarranty or guaranty by DPW of}our it <br />Hance d nozzles, vapor recovery syster, zs and EVR PHASE I systems. This tra <br />of eliminate the need to strict/y adhere to manufacturer instructions and puce <br />ntaintaming nozzles, vapor recovery systems and EVR PH45E I Systems. All n <br />Y systems and EVR PHASE I Systems must be installed and maintained in acco <br />instructions and procedures. Attestation applies OM Y to tested named in;?ivid, <br />P V" Attestation No. P 5880 <br />Jessie Wadkins <br />Walton Engineering Inc. <br />!d Installation "Training for EVR Phase I by C <br />On: 10/2/2010 Exp Date: 10/2/2012 <br />.�,f this training course does not create a warranty or guaranty by OPW ofyour <br />tenants of nozzles, vapor recovery systems and EVR PHASE I systems. This t <br />Oct eliminate the need to strictly adhere to manufacturer instnxtions and pro( <br />I maintaining nozzles, vapor feCovdy systems and EVR PH45E I Systems. All <br />'rY systems and EVR PHASE I Systems must be installed and maintained in as <br />r instructions and procedures. Attestation apples ON4 Y to tested named indica <br />Attestation No. P 5857 <br />tAtCN}canrr Richard S. Walton <br />Walton Engineering Inc. <br />d Installation Training for EVR Phase I by O <br />Dn: 101212010 Exp Date: 10/2/2012 <br />f this training course does not create a warranty or guaranty by OPW ofyour i <br />mance of nozzles, vapor recovery systems and EVR PHASE I systems. This fr <br />70t eliminate the need to strictly adhere to manufacturer instnxtrons and prow <br />maintaining nozzles, vapor rcrover/systems and EVR PH45E I Systems. Alli <br />y systems and EVR PHASE I Systems must be installed and maintained in acc: <br />1,75tructions and procedures. Attestalion applies ONLY to tested nankd indiviG <br />
The URL can be used to link to this page
Your browser does not support the video tag.