My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Title 23, CCR 2635 (b)(1) Spill container. All underground storage tanks shall be <br /> equipped with a spill container and an overfill prevention system as follows: <br /> (1) The spill container shall collect any hazardous substances spilled during product <br /> delivery operations to prevent the hazardous substance from entering the subsurface <br /> environment. The spill container shall meet the following requirements: <br /> (A) If it is made of metal, the exterior wall shall be protected from galvanic corrosion. <br /> (6) It shall have a minimum capacity of five gallons (19 liters). <br /> (C) It shall have a drain valve which allows drainage of the collected spill into the <br /> primary container or provide a means to keep the spill container empty. <br /> 4 The 89-octane spill container at the Tracy facility was tested and failed to hold a <br /> minimum of 5 gallons on September 8, 2005, and was not repaired until November <br /> 10, 2005. <br /> Title 23, CCR 2637 (a) Secondary containment test performed. Secondary <br /> containment systems installed on or after January 1, 2001 shall be tested upon <br /> installation, 6 months after installation, and every 36 months thereafter. Secondary <br /> containment systems installed prior to January 1, 2001 shall be tested by January 1, <br /> 2003 and every 36 months thereafter. <br /> 4 Secondary containment testing for the Tracy facility was last performed on <br /> April 15, 2002, and was due by April 2005. Testing was completed on March 20, <br /> 2006, eleven months late. <br /> 4 Secondary containment testing for the Manteca facility was last performed on <br /> October 23, 2003, and was due by October 2006. Testing was completed on <br /> January 13, 2009, fifteen months late. <br /> Title 23, CCR 2637 (e) Secondary containment test report. Underground storage <br /> tank owners and operators shall submit a copy of the test report to the local agency <br /> within 30 days of the completion of the test. <br /> 4 The January 13, 2009, secondary containment test report for the Manteca <br /> facility was not submitted. <br /> Title 23, CCR 2638 (a) Annual monitoring certification and line leak detector <br /> testing. All monitoring equipment used to satisfy the requirements of this article shall be <br /> installed, calibrated, operated and maintained in accordance with manufacturer's <br /> instructions, and certified every 12 months for operability, proper operating condition, <br /> and proper calibration. Written records shall be maintained as required in section 2712. <br /> 4 Monitoring certification and line leak detector testing at the Manteca facility <br /> were performed fourteen months late on November 8, 2005. <br /> --> Monitoring certification and line leak detector testing at the Tracy facility were <br /> performed eight months late on December 30, 2005. <br /> 4 Monitoring certification and line leak detector testing at the Manteca facility <br /> were performed four months late on March 9, 2007. <br /> 4 Monitoring certification and line leak detector testing at the Tracy facility were <br /> performed three months late on March 28, 2007. <br /> -) Monitoring certification and line leak detector testing at the Manteca facility <br /> were performed two months late on May 8, 2008. <br /> Title 23, CCR 2638 (d) Monitoring system certification test report. UST owners and <br /> operators shall submit a completed "Monitoring System Certification" form to the local <br /> agency within 30 days after completion of the inspection. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.