4 The April 3, 2008, monitoring system certification test report for the Tracy
<br /> facility was never submitted.
<br /> Title 23, CCR 2638 (e) Notification of testing. The UST owner or operator shall notify
<br /> the local agency at least 48 hours prior to conducting the installation, repair,
<br /> replacement, calibration, or certification of monitoring equipment unless the notification
<br /> requirement is waived by the local agency.
<br /> 4 A monitoring system certification, leak detector testing, and spill container
<br /> testing were performed on September 7, 2004, without providing any notice to this
<br /> office.
<br /> Title 23, CCR 2712 (b) Maintenance and monitoring records. Written monitoring and
<br /> maintenance records shall be maintained on-site or off-site at a readily available
<br /> location, if approved by the local agency, for a period of at least 3 years, 6 1/2 years for
<br /> cathodic protection maintenance records, and 5 years for written performance claims
<br /> pertaining to release detection systems, and calibration and maintenance records for
<br /> such systems. Records of repairs, lining, and upgrades shall be maintained on site or at
<br /> another approved location for the remaining life of the underground storage tank. These
<br /> records shall be made available, upon request within 36 hours, to the local agency or the
<br /> State Water Board. Monitoring records shall include:
<br /> (1) The date and time of all monitoring or sampling;
<br /> (2) Monitoring equipment calibration and maintenance records;
<br /> (3) The results of any visual observations;
<br /> (4) The results of all sample analysis performed in the laboratory or in the field,
<br /> including laboratory data sheets and analysis used;
<br /> (5) The logs of all readings of gauges or other monitoring equipment, ground water
<br /> elevations, or other test results; and
<br /> (6) The results of inventory readings and reconciliations.
<br /> 4 Maintenance and monitoring records for the Manteca facility were not found on
<br /> site at the time of the April 7, 2005, and November 21, 2005, routine UST
<br /> inspections.
<br /> 4 Maintenance and monitoring records for the Tracy facility were not found on
<br /> site at the time of the April 3, 2008, routine UST inspection.
<br /> Title 23, CCR 2712 (i) Monitoring plan is on site. A copy of the permit and all
<br /> conditions and attachments, including monitoring plans, shall be retained at the facility.
<br /> 4 The monitoring plan was not found on site at the Manteca facility during the
<br /> November 21, 2005, March 9, 2007, and May 8, 2008, routine UST inspections.
<br /> 4 The monitoring plan was not found on site at the Tracy facility during the
<br /> October 19, 2004, December 30, 2005, and April 3, 2008, routine UST inspections.
<br /> Title 23, CCR 2715 (a) Designated operator: statement from UST owner. By
<br /> January 1, 2005, owners of underground storage tank systems shall submit a signed
<br /> statement to the local agency indicating that the owner understands and is in compliance
<br /> with all applicable underground storage tank requirements, and identifying the
<br /> designated UST operator(s) for each facility owned. The owner shall inform the local
<br /> agency of any change of designated UST operator(s) no later than 30 days after the
<br /> change.
<br /> 4 A current designated operator statement for the Manteca facility was not on file
<br /> with this office at the time of the April 7, 2005, November 21, 2005, and May 8,
<br /> 2008, routine UST inspections.
<br /> 17
<br />
|