Laserfiche WebLink
June 2007, February 2008, and April 2008 monthly inspection reports for the <br /> Manteca facility were not found on site at the time of the May 8, 2008, routine UST <br /> inspection. <br /> Title 23, CCR 2715 (f) Designated operator: employee training. By July 1, 2005, <br /> and every twelve months thereafter, the designated UST operator(s) shall train facility <br /> employees for which he or she is responsible in the proper operation and maintenance <br /> of the underground storage tank system. For facility employees hired on or after July 1, <br /> 2005, the initial training shall be conducted within 30 days of the date of hire. <br /> (1) The training for facility employees must include, but is not limited to: <br /> (A) The operation of the underground storage tank system in a manner consistent <br /> with the facility's best management practices. <br /> (B) The facility employee's role with regard to the monitoring equipment as specified <br /> in the facility's monitoring plan. <br /> (C) The facility employee's role with regard to spills and overfills as specified in the <br /> facility's response plan. <br /> (D) The name of the contact person(s) for emergencies and monitoring equipment <br /> alarms. <br /> (2) At least one of the facility employees present during operating hours shall have <br /> current training in accordance with subdivision (f)(1). For facilities that are not <br /> routinely staffed, the designated UST operator shall implement a facility employee <br /> training program approved by the local agency. <br /> (3) A list of facility employees who have been trained by the designated UST operator(s), <br /> shall be maintained on-site or off-site at a readily available location, if approved by <br /> the local agency. The list shall be provided to the local agency upon request. The list <br /> shall include the dates of training for all facility employees, and the hiring dates for all <br /> facility employees hired on or after July 1, 2005. <br /> 4 Employee training records for the Manteca facility were not found on site at the <br /> time of the November 21, 2005, March 9, 2007, and May 8, 2008, routine UST <br /> inspections. <br /> 4 Employee training records for the Tracy facility were not found on site at the <br /> time of the December 30, 2005, routine UST inspection, and the March 7, 2006, <br /> reinspection. <br /> V. ATTACHMENTS <br /> Attachment 1 -April 13, 2004, monitoring system certification test report for Tracy facility <br /> Attachment 2 - September 8, 2004, spill container test report for Tracy facility <br /> Attachment 3 - October 19, 2004, routine UST inspection report for Tracy facility <br /> Attachment 4-October 19, 2004, routine hazardous waste inspection report for Tracy <br /> facility <br /> Attachment 5 - February 17, 2005, follow up letter to October 19, 2004, routine <br /> hazardous waste inspection report for Tracy facility <br /> Attachment 6 - HWTS EPA ID Profile for Tracy facility <br /> Attachment 7 - Permit application, SR0043328, for EVR phase 1 upgrade <br /> Attachment 8 - December 30, 2005,routine UST inspection report for Tracy facility <br /> Attachment 9 - December 30, 2005, monitoring system certification test report for Tracy <br /> facility <br /> 19 <br />