Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.swgov.org/ehd/unitiii.html <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Van De Pol Enterprises Facility 2420 W. Grant Line Rd., Tracy Inspection Dec 20, 2011 <br />Name: p Address: <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS ll, or MINOR -Notice to Comply) <br />ROUTINE ANNUAL INSPECTION & MONITORING SYSTEM CERTIFICATION <br />Class 11 violations: (102, 104, 109, 110, 111, 205) <br />102. The annual operating fees have not been paid. This facility currently has a past due amount of <br />$2,846.56. Operating fees are required to be paid annually. Immediately contact the EHD to arrange <br />payment of all fees for this facility. <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility by January 20, 2012. <br />109, 110, & 111. Annual monitoring system certification and spill container testing were last performed <br />on August 6, 2010 and was completed on December 20, 2011, 4 months past due. Leak detection <br />testing has not been completed. These tests are required once every 12 months. Take all necessary <br />precautions to ensure testing is performed in a timely manner. <br />205. The November designated operator monthly inspection reports were not found on site. Designated <br />operator monthly inspection reports for the previous twelve months shall be retained on site. Locate and <br />ensure that copies of the previous twelve months of designated operator monthly inspection reports are <br />maintained on site. Submit copies to the EHD by January 20, 2012. <br />Complete and submit a copy of the Return to Compliance Certification to the EHD by January 20, 2012, <br />along with a statement documenting the corrective actions that have been or will be taken for each <br />violation and any supporting paperwork. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code Section <br />HSC = CA Health and Safety Code, CFR = Code of Federal Regulations <br />C1 = Class 1 violation, C2 = Class 2 violation: M = Minor violation <br />Non -Pressurized Piping (continued) <br />702 <br />CCR 2643(e) <br />Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (Mi) <br />703 <br />CCR 2643(d) <br />Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M1) <br />Other Violations <br />999 <br />Other: <br />See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS ll, or MINOR -Notice to Comply) <br />ROUTINE ANNUAL INSPECTION & MONITORING SYSTEM CERTIFICATION <br />Class 11 violations: (102, 104, 109, 110, 111, 205) <br />102. The annual operating fees have not been paid. This facility currently has a past due amount of <br />$2,846.56. Operating fees are required to be paid annually. Immediately contact the EHD to arrange <br />payment of all fees for this facility. <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility by January 20, 2012. <br />109, 110, & 111. Annual monitoring system certification and spill container testing were last performed <br />on August 6, 2010 and was completed on December 20, 2011, 4 months past due. Leak detection <br />testing has not been completed. These tests are required once every 12 months. Take all necessary <br />precautions to ensure testing is performed in a timely manner. <br />205. The November designated operator monthly inspection reports were not found on site. Designated <br />operator monthly inspection reports for the previous twelve months shall be retained on site. Locate and <br />ensure that copies of the previous twelve months of designated operator monthly inspection reports are <br />maintained on site. Submit copies to the EHD by January 20, 2012. <br />Complete and submit a copy of the Return to Compliance Certification to the EHD by January 20, 2012, <br />along with a statement documenting the corrective actions that have been or will be taken for each <br />violation and any supporting paperwork. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />