My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWARD
>
11022
>
2900 - Site Mitigation Program
>
PR0540048
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2019 10:32:33 AM
Creation date
1/2/2019 10:31:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540048
PE
2950
FACILITY_ID
FA0022895
FACILITY_NAME
DELTA ISLAND SCHOOL
STREET_NUMBER
11022
STREET_NAME
HOWARD
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
11022 HOWARD RD
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5900 Hollis Street, Suite A <br /> Emeryville, California 94608 <br /> CONESTOGA-ROVERS Telephone: (510)420-0700 Fax: (510)420-9170 <br /> &ASSOCIATES htto://www.craworld.com <br /> March 24, 2015 Reference No. 080238 <br /> Mrs. Bonnie Carter <br /> Director of Facilities Planning and Construction <br /> Tracy Unified School District <br /> 1875 West Lowell Avenue <br /> Tracy, California 95376 <br /> Dear Ms. Carter: <br /> Re: Proposal-Phase II Site Investigation and CEQA Support <br /> Delta Island School <br /> 11022 W. Howard Road <br /> Stockton,California <br /> Conestoga-Rovers&Associates, Inc. (CRA) is pleased to present this proposal to conduct a Phase II <br /> Environmental Site Investigation (Phase II) and provide California Environmental Quality Act(CEQA) <br /> support for potential redevelopment of the Tracy Unified Union School District's (TUSD) Delta Island <br /> School property located at 11022 W. Howard Road in Stockton, California (Site). The Site currently <br /> consists of a vacant school facility, constructed between 1971 and 1973,situated on an approximately <br /> 8-acre parcel of land. <br /> 1.0 PROPOSED SCOPE OF WORK <br /> 1.1 PHASE II ENVIRONMENTAL SITE INVESTIGATION <br /> The Phase I Environmental Site Assessment, ([Phase I ESA], CRA, December 2012) identified Recognized <br /> Environmental Conditions(RECs), Business Environmental Risks(BERs) and Non-Scope Considerations. <br /> As discussed with you and Mr.Addison Covert on March 4, 2012,TUSD would like to establish whether <br /> certain items may present an environmental concern at the Site, namely: <br /> • Lead in soil that could have resulted from wash down of the painted exterior walls, <br /> • Organochlorine Pesticides (OCP) in soil that could be present from former agricultural activities at <br /> the Site and/or the use of termiticides around wooden buildings built prior to 1989, and <br /> • Arsenic,that is known to be present in groundwater regionally,and could be present in soils due to <br /> former agricultural activities. <br /> CRA has prepared this proposal to conduct a Phase II based on these results of the Phase I ESA. CRA's <br /> proposed scope of work is based on the following two applicable regulatory guidance documents from <br /> the Department of Toxic Substances Control:Interim Guidance for Sampling Agricultural Properties <br /> (August 7, 2008), and Interim Guidance Evaluation of School Sites with Potential Soil Contamination as a <br /> Equal <br /> Employment Opportunity <br /> Employer <br /> Worldwide Engineering,Environmental,Construction,and IT Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.