Laserfiche WebLink
®Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 14 <br /> Company Tracy Plant <br /> 2.2 Professional Engineer (PE) Certification <br /> The undersigned registered Professional Engineer (PE) is familiar with the <br /> requirements of 40 CFR § 112 and APSA, has visited and examined this facility, or <br /> supervised examination of the facility by personnel qualified appropriately. The <br /> undersigned registered PE attests: <br /> 1) This SPCC Plan has been prepared in accordance with good engineering <br /> practice, including consideration of applicable industry standards and the <br /> requirements of 40 CFR§ 112 and APSA; <br /> 2) Procedures for required inspections and testing have been established; and <br /> 3) This Plan is adequate for this speck facility. <br /> This certification in no way relieves the owner or operator of the facility of his / her <br /> duty to implement fully this SPCC Plan in accordance with the requirements of 40 <br /> CFR § 112 and APSA. This Plan is valid only to the extent the facility owner or <br /> operator maintains, tests, and inspects equipment, containment, and other devices as <br /> prescribed in this Plan. <br /> Certifying Professional Engineer: <br /> Alejandro J. Alatorre, PE, QSD <br /> President—Alatorre Engineering Solutions, Inc. <br /> Registered Professional Engineer— Registration #032761 <br /> ORROFFgS� <br /> �=f44.1,nuTog9'Fyr� <br /> ' aye'' <br /> ] Nv.yF A 6J30/ZO O ar <br /> qTF CIVIL a�P <br /> CALIf00. <br /> 07-08-2019 <br /> Date <br /> c�nonn..n v��mmw.�umsocc Pi. -Anne o.-oeaa.sea. <br />