Laserfiche WebLink
OPEN CLASS II VIOLATION #711 <br /> Corrective action <br /> Integrity testing was conducted by a certified SP-001 inspector on <br /> March 8, 2019. A copy of the test results was forwarded to the <br /> EHD on May 7th, 2019. <br /> NWP will revise on SPCC plan the Integrity Testing frequency stated <br /> by Certified Inspector for the 10,000 gal. diesel tank; the mobile <br /> refueler will be part of Integrity Testing, visual inspections, etc. <br /> NWP will revise the SPCC Plan to reflect annual Inspections, as <br /> described under STI SP001. This means we will have 12 months of <br /> visual inspections + a 13th annual visual inspection, each year. <br /> . ................................................................................................................................................ <br /> ® Northwest PipeCompaay <br />