My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 - Material and Construction <br />3.01 2"-4" Primary & W-6" Secondary Pipe -The pipe <br />shall be manufactured by the filament winding process using <br />an amine cured epoxy thermosetting resin to impregnate <br />strands of continuous glass filaments, which are wound <br />around a mandrel at a 543/4" winding angle under controlled <br />tension. The pipe shall be heat cured and the cure shall be <br />confirmed using a Differential Scanning Calorimeter. <br />Pipe shall be supplied with T.A.B. (Threaded and Bonded) or <br />plain ends. <br />Pipe shall have a minimum continuous cyclic pressure <br />rating of 125 psig at 150°F in accordance with ASTM D2992, <br />Procedure A or UL 971 pressure rating. <br />All pipe, both primary and secondary, shall be 100% <br />hydrotested at the factory before shipment at a minimum <br />pressure of 265 psig and shall be UL 971-2004 Listed and <br />Labeled. <br />3.02 ASTM D231 O Classifications (at 73.41F) <br />PrimaU Pipe Secondary Pipe <br />2" - 3" RTRP-11 AF 3" RTRP-11AF <br />4" RTRP-11 AH 4"-6" RTRP-11 AH <br />(Mechanical properties cell classifications shown are <br />minimums.) <br />3.03 Fittinas - All fittings shall be manufactured using <br />the same type of material as the pipe. Fittings may be <br />manufactured either by compression molding, filament <br />winding, resin transfer molding or contact molding methods. <br />All fittings, adapter, and sump penetrations shall be UL971- <br />2004 Listed. <br />Primary fittings shall be adhesive bonded, matched <br />tapered bell and spigot and rated the same as the pipe. <br />Secondary containment fittings shall be two-piece style <br />to allow for 100% inspection of the primary joint pressure test <br />and be rated to a minimum of 50 psig per UL 971-2004. <br />Should hydrostatic testing be impractical, testing with <br />low pressure air or inert gas may be acceptable. Extreme <br />caution should be used when testing with air. Follow all <br />safety precautions and testing recommendations of the pipe <br />manufacturer. <br />3.04 Connections - Connections to flex connectors or <br />other piping materials shall be made by the use of NPT <br />(National Pipe Thread) threaded adapters or flanges bonded <br />to the FRP piping system. <br />3.05 Sump Penetrations - Sump penetrations shall be <br />made by means of a permanently bonded FRP coupling. The <br />coupling shall be capable of adjusting for the slope of the <br />piping system entering or exiting the sump wall. <br />3.06 Adhesives - Adhesives shall be manufacturer's <br />standard for the piping system specified. <br />3.07 Acceptable Products - RED THREAD IIA Piping <br />System as manufactured by NOV Fiber Glass Systems or <br />engineered approved equal. <br />SECTION 4 - Installation and Testing <br />4.01 Training and Certification - All joints installed or <br />constructed in the field shall be assembled by employees <br />of the contractor who have been trained by the pipe <br />manufacturer. The pipe manufacturer or their authorized <br />representative, shall train the contractor's employees in the <br />proper joining and assembling procedures required for the <br />project, including hands-on participation by the contractor's <br />employees. Each bonder shall fabricate one pipe -to -pipe <br />and one pipe -to -fitting joint that shall pass the minimum <br />pressure test for the application as stated in Section 2.03 <br />without leaking. <br />Only bonders that have successfully completed the <br />pressure test shall bond pipe and fittings. Each bonder shall <br />cant' a current, manufacturer proof of training card. <br />4.02 Pipe Installation -Pipe shall be installed as specified <br />and indicated on the drawings. <br />The piping system shall be installed in accordance with <br />the manufacturer's current published installation procedures. <br />4.03 Testing - A hydrostatic pressure test shall be <br />conducted on the completed piping system. The piping <br />system shall be subjected to 10 pressurization cycles from 0 <br />psig to 1.5 times the design operating pressure as stated in <br />Section 2.03.c. After the 10 cycles, the pressure shall be held <br />on the system for a minimum of 1 hour and the line inspected <br />for leaks. <br />Test pressures shall not exceed 1.5 times the maximum <br />rated pressure of the lowest rated element in the system. <br />All pipe joints shall be water tight. All joints that are found <br />to leak, by observation or during testing shall be replaced by <br />the contractor and retested. <br />Should hydrostatic testing be impractical, testing with <br />low pressure air or inert gas may be acceptable. Extreme <br />caution should be used when testing with air. Follow all <br />safety precautions and testing recommendations of the pipe <br />manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.