My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.07 Acceptable Products - RED THREAD IIA Piping Secondary Containment Piping <br />System as manufactured by NOV Fiber Glass Systems or <br />engineered approved equal. <br />SECTION 1 - Scope <br />SECTION 4 - Installation and Testina <br />4.01 Training and Certification - All joints installed or <br />constructed in the field shall be assembled by employees <br />of the contractor who have been trained by the pipe <br />manufacturer. The pipe manufacturer or their authorized <br />representative shall train the contractor's employees in the <br />proper joining and assembling procedures required for the <br />project, including hands-on participation by the contractor's <br />employees. Each bonder shall fabricate one pipe -to -pipe <br />and one pipe -to -fitting joint that shall pass the minimum <br />pressure test for the application as stated in Section 2.03 <br />without leaking. <br />Only bonders that have successfully completed the <br />pressure test shall bond pipe and fittings. Each bonder shall <br />carry a current manufacturer's proof of training card. <br />4.02 Pipe Installation - Pipe shall be installed as specified <br />and indicated on the drawings. <br />This section covers the use of fiberglass reinforced plastic <br />(FRP) pipe for fuel handling and fuel handling vent and vapor <br />applications including gasoline, unleaded gasoline, gasoline/ <br />alcohol mixtures, bio -diesel and diesel that require secondary <br />containment. <br />SECTION 2 - General Conditions <br />2.01 Coordination - Material furnished and work <br />performed under this section shall be coordinated with the <br />related work and equipment specified under other sections, <br />i.e. Valves, Flexible Connectors, Equipment. <br />2.02 Governing Standards - Except as modified or <br />supplemented herein, all materials and construction methods <br />shall comply with and be tested in accordance with the <br />following standards and test methods: <br />The piping system shall be installed in accordance with the Standards and Test Methods: <br />manufacturer's current published installation procedures. <br />4.03 Testing - A hydrostatic pressure test shall be <br />conducted on the completed piping system. The piping <br />system shall be subjected to 10 pressurization cycles from 0 <br />psig to 1.5 times the design operating pressure as stated in <br />Section 2.03.c. After the 10 cycles, the pressure shall be held <br />on the system for a minimum of 1 hour and the line inspected <br />for leaks. <br />Test pressures shall not exceed 1.5 times the maximum <br />rated pressure of the lowest rated element in the system. <br />All pipe joints shall be water tight. All joints that are found <br />to leak, by observation or during testing, shall be replaced by <br />the contractor and retested. <br />Should hydrostatic testing be impractical, testing with <br />low pressure air or inert gas may be acceptable. Extreme <br />caution should be used when testing with air. Follow all <br />safety precautions and testing recommendations of the pipe <br />manufacturer. <br />UL971 <br />2004 <br />Standard for Nonmetallic Underground Piping for Flam- <br />mable Liquids <br />ASTM <br />Standard Classification for Machine -Made "Fiberglass" <br />D2310 <br />(Glass Fiber Reinforced Thermosetting Resin) Pipe <br />ASTM <br />Standard practice for obtaining Hydrostatic or Pressure <br />D2992 <br />Design Basis for "Fiberglass" (Glass Fiber Reinforced <br />Thermosetting Resin) Pipe and Fittings <br />2.03 Operating Conditions - In addition to the above <br />listed minimum design requirements, the system shall meet <br />the following minimum operating conditions: <br />a. Operating Pressure <br />b. Fluid Conveyed <br />c. Test Pressure <br />2.04 Quality Assurance - Pipe manufacturer's quality <br />program shall be in compliance with ISO 9001 and/or API Q1. <br />2.05 Delivery. Storage. and Handling - Pipe and fittings <br />shall be protected from damage due to impact and point <br />loading. Pipe shall be properly supported to avoid damage <br />due to flexural strain. The contractor shall not allow dirt, <br />debris or other extraneous materials to get into pipe and <br />fittings. All factory machined areas shall be protected from <br />sunlight until installed. <br />2.06 Acceptable Manufacturers - NOV Fiber Glass <br />Systems, 501-568-4010, or approved equal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.