Laserfiche WebLink
Industry Standard Requirements for Tank Inspection Frequency (cont.) <br /> In Table 5.5 use the following dengnotions': - <br /> P-Periodic AST inspection E-Formal External Inspection by Certified Inspector <br /> L-Leak test by owner's designee I-Formal Internal Inspection by Certified Inspector <br /> U indicates maximum Inspection interval in years.For example;E(5)indicates formal external Inspection every 5 years. <br /> SP001 Table 5.5:Inspection Schedules ConVault <br /> Shop Fabricated AST Size(us Gallons; Category Category Category <br /> 0-1100 <br /> (0-4,164 liters) P P P,E&L(W) <br /> Shop 1,101-5,000 P,E&L(5),I(10) <br /> Fabricated (4,168-18,9271Rers) P P,E&L(10) <br /> ASTs P,L(2),E(5) <br /> 5,001-30,000 0EOG),I(20) P,F&L(5),I(10) <br /> 08,931 -113,562 liters) P,E(20) P E(S),L(10) P E&L($E(5) <br /> 30,001 -SOA00 P,E(20) P,E&L(5),I(15) P,E&L(5),I(15) <br /> Portable Containers - p p P• <br /> 'Owners shall eitherdisconrinue use ofpo(tableormWnsrfer storage orhaverhepormble container DOT <br /> (Department of7amspo twiun)tostedand recerti6odper following schedule(refer to Section 9.0): <br /> Plastic containers-every 7years;steeiportablecontmner-every 17 years <br /> Stalnlet55[eel container-every llyears <br />