My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
13520
>
2900 - Site Mitigation Program
>
PR0527550
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:00:11 PM
Creation date
1/18/2019 4:46:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0527550
PE
2950
FACILITY_ID
FA0018662
FACILITY_NAME
COS DELTA WTR SUPPLY INTAKE PRJCT
STREET_NUMBER
13520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
13520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> KLEINFELOER "`"" """:" <br /> �uTghf fFe64..j4f Yu,!I.e,' fiO3 <br /> P11:&SdQ.i.i=5 <br /> f l:Je 111,E?00 <br /> File No.87057.G14 <br /> October 28, 2009 <br /> Mr. Gilbert Cosio,Jr. <br /> MBK Engineers <br /> Reclamation Districts 2029 and 2044 <br /> 2450 Alhambra Blvd,2"d Floor <br /> Sacramento, CA 95817 <br /> Subject: Drilling Work Plan and Access <br /> Geotechnical Borings near <br /> Bishop Cut and Honker Cut <br /> Stockton, California <br /> Dear Mr. Cosio: <br /> In accordance with your request and on behalf of the City of Stockton, we have <br /> prepared this letter to describe our proposed scope of work. Access is requested in <br /> accordance with the original encroachment agreement executed between Delta Farms <br /> Reclamation Districts 2029 and 2044 and the City of Stockton on December 11, 2008. <br /> We have been contracted by Camp, Dresser,and McKee(CDM)as Project Engineer to <br /> the City of Stockton to advance three additional geotechnical borings within or near <br /> Reclamation District's 2044 and 2928 jurisdiction. The purpose of these borings is to <br /> gather geotechnical information that will be of assistance to the Delta Water Supply <br /> Pipeline and Treatment Plant project. <br /> Scope of Work <br /> Based on discussions with yeurself and the Cily of Stockton,we propose the following: <br /> Drill north of Eight Mile Road and west of Bishop Cut(Plate 2): <br /> • Drill a test boring (1343)through the levee crown <br /> • Drill a test boring (B-42)wast of the Bishop Cut levee at the receiving shaft <br /> location approximately 250 feet west of the levee centerline and 70 feet <br /> 87057.G14IV00L225R Pago 1 of 4 October 20,2009 <br /> C.ryrglt 21M 10600dcr PwWcim Nn r,dMao 0,1,,herla 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.