My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
13520
>
2900 - Site Mitigation Program
>
PR0527550
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:00 PM
Creation date
1/18/2019 5:01:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527550
PE
2950
FACILITY_ID
FA0018662
FACILITY_NAME
COS DELTA WTR SUPPLY INTAKE PRJCT
STREET_NUMBER
13520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
13520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DER <br /> Bright Bright ttnpk.RigMIDiutirr. <br /> The well will be finished with a locking pressure cap when not in use to limit the <br /> introduction of foreign matter into the well. <br /> 1.4. TEMPORARY WELL DEVELOPMENT <br /> Following installation of the well screen and casing, the test well will be developed to <br /> remove fine silt from the well bore and to effectively increase the hydraulic radius of the <br /> well. Air lifting and surging along the screened interval of the well will be performed to <br /> settle the sand filter pack and draw fine grained material out of the well. The well <br /> development purge water will be discharged to the land surface in such a manner as <br /> not to allow the discharge to enter back into the well or any surface water body. <br /> 1.5. PUMPING TEST <br /> The temporary test well will be pumped at a constant rate for up to 24 hours following <br /> the completion of the installation. The water levels will be recorded in the surrounding <br /> piezometers and pumping well during the test. The discharge water generated during <br /> the test will be directed out into the farmer's field and not allowed to flow back into the <br /> well. <br /> 1.6. PIEZOMETER AND WELL ABANDONMENT <br /> In accordance with San Joaquin Well Standards for the appropriate abandonment of <br /> water wells, the piezometers and temporary well casing will be destroyed by pressure <br /> grouting each in place. An approved grout mixture will be installed into the well via <br /> tremmie pipe, filling the well screen and casing from the bottom up. After the well <br /> casing has been filled, a cap will be installed onto the well top and pressure will be <br /> applied until it stabilizes to the agreement of the SJEHD inspector. The top 3 feet of <br /> the PVC well casing will be excavated and cut off below grade, and additional grout will <br /> be introduced to the well casing and allowed to flow over the top of the casing and into <br /> the excavation creating a mushroom cap of cement. <br /> 87057IST09L024 Page 5 of 7 February 5, 2009 <br /> Copyright 2009 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.