My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
2800
>
2800 - Aboveground Petroleum Storage Program
>
PR0516358
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 9:25:47 AM
Creation date
1/25/2019 3:45:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516358
PE
2832
FACILITY_ID
FA0003774
FACILITY_NAME
VALLEY FARMS TRANSPORT
STREET_NUMBER
2800
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16528007
CURRENT_STATUS
01
SITE_LOCATION
2800 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROFESSIONAL ENGINEER CERTIFICATION (40 CFR 112.3(d)) <br /> I hereby certify that 1, or my agent, have examined the facility and,being familiar with the provisions of <br /> 40 Code of Federal Regulations (CFR)Part 112, attest that this Spill Prevention Control and <br /> Countermeasure(SPCC) Plan has been prepared in accordance with good engineering practices <br /> including consideration of applicable industry standards and the requirements of 40 CFR Part 112 and is <br /> adequate for the facility and that procedures for required inspections and testing have been established. <br /> This certification in no way relieves the owner or operator of the VFT Stockton Terminal of the duty to <br /> prepare and fully implement a Plan in accordance with the requirements of 40 CFR 112.3. <br /> Engineer: Alan Candlish <br /> Signature and Professional Stamp: pppFESStp, <br /> ERr <br /> KLP C30270 <br /> r Elm I � <br /> CIVR �c <br /> �afCA�t1� <br /> MANAGEMENT APPROVAL-40 CF <br /> This SPCC plan is fully approved by the management of the VFT Stockton Terminal, and the necessary <br /> resources have contour ed to implement the plan as described. <br /> -7-13Z <br /> Smart Davidson—Risk Manabert Date <br /> Spill Prevention Manager <br /> VFT Sk,ck,on Tnm.al <br /> 2800 French Cmnp Tumpike,Stockton,CA <br /> P.,2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.