Laserfiche WebLink
contractors, and I was told by Richards that the driver, Francine told him not to call a clean-up <br /> contractor anymore because CHP told them if they cannot find one, EHD will call a contractor. I told the <br /> driver, EHD is not a calling a contractor, the RP need to do it. I called Richard and told him that if he <br /> could not find a clean-up contractor, I can text him a list of contractor he can choose from. I discussed <br /> the situation with CHP and told them EHD is not calling the contractor, but the RP responsibility to call <br /> them. I texted the contractors list to Richard, and I confirmed receiving it.At 1016 1 called Richard to <br /> check the status. Richard told me that he called Ponder Environmental Services, and they should be on <br /> scene within 1-2 hours. I updated Elena on the status.A notice to abate was issued to the driver by <br /> Elena. Elena left to respond to another incident, and I waited for the clean-up contractors. <br /> At 1230 Jose Colin with Ponder Environmental arrived on scene and we discussed the clean-up. Jose <br /> told me the trailer for the clean-up/equipment should arrive within 30 mins. At 1248 Ponder <br /> Environmental trailer arrived and they started the clean-up. <br /> I explained our expectation to the contractors. At 1430 1 called Muni and told him that I am leaving the <br /> scene to use the restroom and have lunch. AT 1433 1 left the scene and notified Valley Com..At 1510 1 <br /> returned to the incident scene and the contractors asked me if the need to do additional clean up, and I <br /> told them yes. I told the contractors to apply more absorbent to the stained asphalt and to shovel all <br /> the contaminated Soil. At 1530 1 sent photos to Kasey to get her opinion if more clean-up is required. I <br /> told Kasey that all the contaminated soil was removed, but some of the asphalt is still stained. Kasey told <br /> me she is not going to require the contractors to dig the asphalt, and the clean-up should be fine at this <br /> stage. Seven drums of Hazardous Waste were collected and labeled as hazardous waste. I took a photo <br /> of the shipping manifest. At 1623 1 called SJC PW Road Maintenance and told them that the clean-up is <br /> done. I was asked by SJC PW Road Maintenance to put the signs aside and they will send notification to <br /> open the road. At 1635 1 left the incident scene. <br /> Refer to Elena narratives for additional information about this incident. <br />