My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2900 - Site Mitigation Program
>
PR0516471
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 10:53:44 AM
Creation date
2/1/2019 10:05:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516471
PE
2950
FACILITY_ID
FA0012627
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1.0 INTRt DUCTION <br /> 1. This Workplan for Evaluation of Sack round Ground Water Quality has been prepared on <br /> g , <br /> behalf of The Burlington Northern and Santa Fe Railway Company (BNSF).and describes the <br /> activities for assessment of the background ground water quality at the proposed BNSF <br /> Stockton Intermodal Facility site located adjacent to and south of the BNSF main rail track <br /> between Austin Road on the west and Jack Tone Road on the east in San Joaquin County, <br /> California. The location of the site is shown in Figure 1. <br /> 2. The ground water evaluation described herein is intended to define background ground water <br /> quality upgradient of the proposed oil water separator (OWS) and evaporation pond in <br /> compliance with Title 27 Section 21750(8), <br /> 3. This Workplan has been prepared in respo7'WQCB's) <br /> to the California Regional 'Water Quality <br /> Control Board- Central Valley Region's( December 20, 1999 letter. <br /> 4. The proposed scope of work includes installation of one ground water monitoring well to be <br /> located near the property boundary in the upgradient direction of ground water flow. The <br /> proposed well will provide information regarding quality of ground water flowing onto the <br /> property (i.e.,background). Additional pr eet background information is presented in <br /> Section 2.0, the proposed scope of work i presented in Section 3.0, and the proposed <br /> schedule is presented in Section 4.0. <br /> 2.0 BACKGROUND <br /> I <br /> I. BNSF is planning to build a new Intermodal Facility east of Stockton, California in San Joaquin <br /> County. The Intermodal Facility will be built on 470 acres of land adjacent to and south of the <br /> BNSF main rail track between Austin Road on the west and Jack'Pone Road on the east. A <br /> vicinity map showing the approximate location of the proposed Intermodal Facility is presented <br /> in Figure 1. <br /> 2- The proposed Intermodal Facility will be used for transferring shipping containers and trailers <br /> between railcars and semitrailer trucks. Specialized cranes will be used to load and unload the <br /> containers and trailers onto and off of railcars. Off-road trucks (i.e., hostlers) will be used to <br /> move the containers and trailers about the facility. <br /> 1 7RC <br /> CoaromerFxvsed Solufiau <br /> 90 'd MVM 00, LZ 1 n <br />
The URL can be used to link to this page
Your browser does not support the video tag.