Laserfiche WebLink
M0;N7TOP3NG AND REPORTING PROGRAM NO. 5-00-113 -6- <br /> CLASS 11 SURFACE IMPOUNDMENT <br /> THE BURLINGTON NORTHER AND SANTA FE RAI.W Y CO. <br /> STOCK'T'ON INTERMODAL FACILITY <br /> S-N JQ AQULN'COUNTY <br /> i <br /> 5. LCRS Monitoring <br /> The LCRS sump shall be.inspected quarterly for leachate.Upon detection of leachate in a previously dry <br /> LCRS,the Discharger shall immediately collect a grab sample of the leachage and shall continue to <br /> collect grab samples of the leachate at the following frequencies thereafter. The LCRS shall be sampled <br /> and analyzed for the following: <br /> Table 5- LCRS Monitorlo <br /> Parameters Units Freauency <br /> Field Parameter <br /> Flow Rate gallons/month Monthly <br /> Temperature °C Quarterly <br /> Specific Conductance umhos/cm Quarterly <br /> pH pH number Quarterly <br /> Monitoring Parameters <br /> Total Dissolved Solids m- g/L Queerly <br /> TPH-diesel mg/L Quarterly <br /> TPH-oil&grease mg/L Quarterly <br /> Volatile Organic Compounds ug/L Quarterly <br /> (F-PA Method 8260, see Attachment C) <br /> Chloride mg/L Quarterly <br /> Sulfate mg/L Quarterly <br /> Nitrate-Nitrogen mg/L Quarterly <br /> Dissolved Metals(Baniurn,Copper,Lead, mg/L Quarterly <br /> &Zinc) <br /> All LCRSs shall be tested annually to demonstrati operation in conformance with waste discharge <br /> requirements. The results of these tests shall be reported to the Board and shall include comparison with <br /> earlier tests made under comparable conditions. <br /> i <br /> TZ 'd 8b:VT 00, Zz inl: <br />