Laserfiche WebLink
4. Ground water elevations shall be measured quarterly in all monitoring wells_ Sampling and <br /> analysis of the monitoring wells will occur semiannually as shown in Table 1. The wells shall <br /> be purged three times their well volumes or until dry prior to sampling_ <br /> 4.0 PROPOSED SCHEDULE <br /> 1. It is anticipated that,after the RWQCB reviews and approves the Workplan,drilling, initial <br /> sampling activities and laboratory analyses of the initial ground water samples can be <br /> completed within a time period of approximately 7 weeks. <br /> 5.0 REFERENCES <br /> RWQCB, letter(re: Review of Workplan for Evaluation of Background Ground Water Quality, <br /> Oil Water Separator and Evaporation Pond, Proposed BNSF Stockton Internodal,Facility, San <br /> Joaquin County, California). March 16, 2000. <br /> RWQCB, tetter(re: Notice ofAdoption of Waste Discharge Requirenrenrs for the Burlington <br /> Northern and Santa Fe Railway Company, BNSF Stockton Intermodal Facility, San Joaquin <br /> County). June 26, 2000. <br /> TRC, 2000. Workplan for Evaluation of Background Ground Water Quality. March 2000, <br /> TRC, 2000x_ Addendum to Workplan for Evaluation of Background Ground Water Quality. <br /> August 4, 2000. <br /> 6 rlqc <br /> G41v Cr{oou34,�-Sofvnons <br /> En "A qn:p Tn. c upr <br />