My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3190
>
2900 - Site Mitigation Program
>
PR0529644
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 1:57:55 PM
Creation date
2/1/2019 1:54:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0529644
PE
2950
FACILITY_ID
FA0019606
FACILITY_NAME
STOCKTON CADILLAC
STREET_NUMBER
3190
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802024
CURRENT_STATUS
01
SITE_LOCATION
3190 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' businesses which store more than 500 gallons of liquid hazardous materials. The Business <br /> Plan is filed with local regulating authorities such as the Fire Department or County <br /> ' Department of Health. Its purpose is to inform local authorities of the possible presence of <br /> hazardous materials, information which may be useful in the event of an emergency. Site <br /> personnel were aware of this requirement but could not confirm that a Business Plan had <br /> ' been prepared and submitted to local authorities. <br /> Structures <br /> Car Showroom and Sales and Administration Offices <br /> iThe auto showroom, sales and administration offices covered approximately 10,700 square feet <br /> and was constructed of masonry brick and steel. The interior walls were constructed of wood <br /> paneling and sheetrock. The ceiling consists of two feet by two feet acoustical panels in a drop <br /> ' ceiling. The floor is covered with one square foot terracotta tiles in the showroom, and carpet <br /> in the offices. The electricity, heating, and water were functioning at the time of the inspection. <br /> The utilities for the site are public water and sewer. The floor plan for the building is shown on <br /> ' Figure 5. There was no indication that the sinks or toilets had been used for disposal of <br /> hazardous materials. <br /> i <br /> ' Privileged and Confidential Prepared at the Request of Counsel <br /> ' 13 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.