My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3190
>
2900 - Site Mitigation Program
>
PR0529644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:03:13 PM
Creation date
2/1/2019 1:55:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529644
PE
2950
FACILITY_ID
FA0019606
FACILITY_NAME
STOCKTON CADILLAC
STREET_NUMBER
3190
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802024
CURRENT_STATUS
01
SITE_LOCATION
3190 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,DOW ENVIRONMENTAL, <br /> ErrA�c . <br /> ::$IM <br /> R. <br /> 5 <br /> 40 <br /> J7 <br /> >;>;>:: <br /> .:........ . <br /> : <br /> :.:::::::::. . <br /> ....::::.. <br /> :::.Win.:..............::.v::::....:::.......... /..}, ........::::::::.....................:v:::.::,....,..,.:::;:.......::::....::.............. .............................:.:........v:v::::::::::::;:::::::::::::::::::................ <br /> X. <br /> PROJECT NAME: Argonaut Realty-Galles Oldsmobile- PROJECT NUMBER: DATE: 4/4/95 <br /> Stockton, CA 2 <br /> TO. Terry Fitzpatrick FROM: Mark Sylvester <br /> COMPANY: Argonaut Realty ADDRESS: 15204 Omega Drive <br /> ADDRESS. Room 939H Argo A, 485 W. Milwaukee Ave ADDRESS: Rockville, MD 20850 <br /> Detroit, MI 48202 <br /> TELEPHONE: (313) 556-2461 IT ELEPHONE: (301) 948-0040 <br /> XENCLOSED E] TRACING DRILLING LOG(S) El APPROVED <br /> UNDER SEPARATE COVER F-1 EQUIP. DATA SHEET(S) TEST RESULT(S) APPROVED AS NOTED <br /> DMESSENGER DRAWING(S) DOCUMENT(S) D CORRECT <br /> FIRST CLASS MAIL SPECIFICATION(S) CONTRACTS Cl RESUBMIT <br /> OVERNIGHT DELIVERY D LETTER/REPORT X FOR APPROVAL El REJECTED <br /> SPECIAL DELIVERY F1 PHOTO(S) D FOR YOUR USE F-1 FOR COMMENT <br /> BY FACSIMILE ❑ <br /> DISKETTE(S) X AS REQUESTED El <br /> }. .., <br /> 1 2463 Cost Estimate for Hybrid Environmental Assessment at Galles 4/4/95 <br /> Oldsmobile - Stockton, CA <br /> REMARKS: The Scope of Work consists of drilling six ten-foot deep borings as follows: Four 10-foot <br /> borings adjacent to the sites of hydraulic lifts in the service area, and two 10-foot dejeqjborings <br /> adjacent to the three stage clarifier. The soil samples from the ten-foot borings adjacent to the <br /> former lifts will be analyzed for TPH by method 8015 at 8-10 feet deep. Samples taken adjacent to <br /> he three stage clarifier will be analyzed for TPH by method 8015, and Volatile Organic Constituent <br /> (VOCs) by method 8240. Up to four shallow (hand auger) soil samples may be collected adjacent <br /> o the four aboveground storage tanks, if the floor beneath the tanks appears to be stained from <br /> prior spills and is cracked or porous. These soil samples would be analyzed for TPH (oil, <br /> transmission fluid, and waste oil tanks) or VOC (coolant tank). A standard Phase One asses=ent_ <br /> will be conducted in parallel with the field_investigation. The estimated time to complete the work <br /> is five weeks from the notice to proceed. The accelerated schedule would reduce the analytical <br /> time to approximately one week, and the total project time to approximately three weeks. The <br /> estimated project cost is $12,287; the accelerated project cost estimate is $14,443. This scope of <br /> work has been prepared in accordance with comments from Ms. Van Camp. <br /> Copy To: Deena Van Camp (313) 556-0803 <br />
The URL can be used to link to this page
Your browser does not support the video tag.