Workplan for Phase II Subsurface Investigation <br /> 3190 Auto Center Circle <br /> Stockton,California 95212 <br /> Partner Project Number 81147 <br /> March 10,2009 <br /> Page ( 2 <br /> Proposed Field Activities <br /> To address the recognized environmental condition identified by the Phase I,Partner will conduct a Phase <br /> 11 Subsurface Investigation. The scope of the investigation will include six soil borings(PES-131 through <br /> PES-B6). <br /> Utility Clearance <br /> Partner will notify Underground Services Alert North (USA) to clear public utility lines as required by <br /> law at least 48 hours prior to drilling activities. <br /> Health and Safety Plan <br /> Partner will review a site-specific Health and Safety Plan with all on-site personnel involved in the project <br /> prior to the commencement of drilling activities. <br /> Drilling Equipment <br /> Partner will subcontract with EnProb Environmental Probing (EnProb) (State of California C57 Water <br /> Well Drilling Contractor License Number 7770077)to provide and operate drilling equipment. Under the <br /> direction of Partner, Enprobe will advance borings PES-131 through PES-135 with a direct-push, truck- <br /> mounted Geoprobe drill rig and boring PES-135 will be advanced with a direct-push, limited-access <br /> Geoprobe drill rig. All drilling rods and/or sampling equipment will be decontaminated between samples <br /> and/or boreholes to prevent cross-contamination. <br /> Boring Locations <br /> Borings PES-B 1 and PES-132 will be advanced in the vicinity of the clarifier. Borings PES-133 and PES- <br /> B4 will be advanced in the automotive repair bays, at least one of which will be in the vicinity of the <br /> drain. Boring PES-135 will be advanced adjacent to the south of the property building in the vicinity of a <br /> potential subsurface vault and boring PES-136 will be advanced in the vicinity of the hazardous materials <br /> storage area. Please see Figure 3 for a map indicating proposed boring locations. <br /> Sampling Depths <br /> Borings PES-B1 through PES-136 will be advanced to a terminal depth of 15 feet below ground surface <br /> (bgs). Soil samples will be collected continuously from each boring until the terminal depth. A minimum <br /> of 24 soil samples will be prepared for laboratory analysis. Groundwater is not expected to be <br /> encountered during this investigation. <br /> Soil Sampling Methodology <br /> Soil samples will be collected using a 4-foot long by 2-inch diameter MacroCore sampler with a 4-foot <br /> long acetate liner, which will be advanced by the direct-push drill rig using 4-foot long (3-foot long for <br /> limited-access rig) by 1.5-inch diameter drill rods. The sampler will be driven into the subsurface to <br /> allow undisturbed soil to enter the open MacroCore barrel and retrieved in 4-foot intervals to recover the <br /> soil-filled liners. <br />