Laserfiche WebLink
Page 3 <br /> March 11, 2014 <br /> Project Numbers 2014-03-005 <br /> Yosh Mataga <br /> 3261 Auto Center Circle <br /> Stockton, CA 95212 <br /> 209-470-2330 <br /> yosh@mataga.com <br /> Subject: Phase II Environmental Site Assessment Workplan For <br /> Auto Center Circle Property <br /> 3261 Auto Center Circle <br /> Stockton, CA 95212 <br /> APN(s): 12802013 <br /> Dear Mr. Mataga: <br /> 1. SUMMARY <br /> Enviro Assess has been retained by Mr. Mataga, to conduct a Phase II Environmental Investigation at <br /> 3261 Auto Center Circle, Stockton, CA 95212. The property uses oil related chemicals and has an <br /> oil/water separator on site. <br /> Our office previously completed a Phase I Environmental Site Assessment (August 2013) in which we <br /> identified the site is currently an used automotive dealership with service and detailing departments. <br /> The workplan is organized into the following sections: general information, health and safety plan, <br /> groundwater sampling procedures, proposed time schedule for work, and report preparation. We <br /> understand the investigation may not proceed until after Owners and County's approval of the workplan. <br /> A California licensed engineering geologist will oversee the investigation on the site. <br /> 2. GENERAL INFORMATION <br /> Soil and/or Groundwater Sampling Purpose,Location, and Depth <br /> The basic purpose for collecting soil and/or groundwater samples is to identify if any impacts to on-site <br /> soils and/or groundwater which may have occurred as a result of possible leakage from the oil/water <br /> separator. <br /> The requested borehole locations are described below: <br /> C ENVIRO ASSESS ENVIRONMENTAL•ENGINEERING•GEOLOGY <br /> PO BOX 1154,BONNERS FERRY,ID 83805 PHONE(877)629-6838 FAX(877)623-5493 <br />