My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTUMN CHASE
>
0
>
2900 - Site Mitigation Program
>
PR0506190
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:40:24 PM
Creation date
2/1/2019 2:07:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506190
PE
2953
FACILITY_ID
FA0007262
FACILITY_NAME
FLORSHEIM HOMES
STREET_NUMBER
0
STREET_NAME
AUTUMN CHASE
STREET_TYPE
CIR
City
STOCKTON
Zip
95219
CURRENT_STATUS
02
SITE_LOCATION
AUTUMN CHASE CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> EN V I R 0 M E T R I X <br /> Grupe Development Company May 16, 1996 <br /> Mr, Shane Hart Page 3 of 4 <br /> SOIL EXCAVATION AND CLEARANCE SAMPLING <br /> EMC excavated approximately 60 cubic yards of soil to a depth of 1.5 feet along the western <br /> edge of the Quonset Hut. Jim Thorpe Oil, Inc. (Thorpe), Lodi, California excavated the <br /> contaminated soil using a John Deere 410?backhoe. The excavated area was approximately <br /> 25 feet by 60 feet by 1.5 feet (Plate 5). <br /> EMC marked the approximate locations of samples Q1, Q2, Q3, Q5 and Q6 identified in the <br /> Levine-Fricke Report. These locations correspond to EMC's clearance sampling locations <br /> CS-1, CS-2, CS-3, CS-5 and CS-6, respectively. Clearance sample locations are presented on <br /> Plate 5. Three clearance samples were collected at both CS-1 and CS-6 at a depth of 1.5, 2.0 <br /> and 2.5 feet bgs. EMC collected one sample at 1.5 feet bgs for samples CS-2 through C-5 and <br /> CS-7 through CS-11. EMC collected a total of 15 clearance soil samples for laboratory <br /> analysis. All clearance sampling locations were approved by Mr. Infurna. <br /> Clearance soil samples were collected in 6-inch pre-cleaned stainless steel tubes using a hand <br /> sampler. The end of the tubes were covered with Teflon tape, capped with plastic caps, sealed <br /> and placed in a cooled ice chest for transport under Chain-of-Custody procedures to Quanterra <br /> Environmental Services (Quanterra), a state certified laboratory in West Sacramento, <br /> California, for analysis. The samples were analyzed for Total Pesticides by EPA <br /> Method 8080. <br /> Excavated soil was stockpiled on visqueen and covered at the location identified of Plate 4. <br /> GROUNDWATER SAMPLING <br /> EMC excavated in the area of CS-1 to a depth of approximately 8 feet bgs to collect a <br /> groundwater sample. Groundwater was encountered at 7 feet bgs. The water sample, Water-1, <br /> was collected with a new pre-cleaned bailer and decanted into laboratory supplied containers. <br /> The sample was immediately placed in an iced cooler and transported under Chain-of-Custody <br /> procedures to Quanterra for analysis. The sample was analyzed for Pesticides by EPA Method <br /> 8080. <br /> RESULTS <br /> EMC collected a total of 15 clearance soil samples. Results of laboratory analysis indicated <br /> that all soil samples, with the exception of CS-8@1.5 feet bgs, reported non-detectable levels <br /> for all analytes in the EPA 8080 series. Laboratory results for sample CS-8@1.5 feet bgs <br /> reported 0.075 ppm 4,4'-DDE, 0.021 ppm 4,4'-DDD and 0.650 ppm 4,4'-DDT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.