My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
501
>
2900 - Site Mitigation Program
>
PR0515006
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:23:29 PM
Creation date
2/1/2019 4:17:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515006
PE
2950
FACILITY_ID
FA0012004
FACILITY_NAME
FONZIA CORPORATION
STREET_NUMBER
501
STREET_NAME
ACACIA
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
501 ACACIA ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL <br /> h CONSULTANTS' <br /> .l it - <br /> S <br /> Mr. William Rieger Page 5 <br />� - � <br /> Fortihber Corporation Clayton Proposal No. 93-B-110 <br /> April 6, 1993 1+ <br /> S <br /> Water (reported in micrograms per liter) <br /> i One water sample P <br /> EPA Method 8015 for TPH (Single sample surcharge)-' <br /> i` as diesel 1 analysis @ $1'00/each $ 150* <br /> EPA Method 8015 for TPH 1 analysis @ $100/each 150* <br /> as oil and grease �l <br /> �} J , <br /> , <br /> • EPA Method 8020 for BTEX 1 analysis @ $90/each 135* <br /> • EPA Method 8315 for formaldehyde 1 analysis 150 each 225 <br /> i <br /> Y <br /> Ik <br /> Subtotal, Water Analyses 1 $ 660 <br /> The laboratory prices quoted reflect a standard 2-week <br /> turnaround time. If a faster <br /> turnaround time is requested, a surcharge of 50% to 100% will be assessed <br /> depending on turnaround time. *A 50% surcharge will be assessed for single <br /> sample analysis. <br /> f . <br /> ESTIMATED PROJECT TOTAL $ 5895 <br /> SCHEDULING i <br /> Clayton will begin work within 7 days of receipt of your authorization to proceed. We <br /> estimate that we will complete field work within 30 days of Ithe start date of the project <br /> and will deliver our final report to Fortifiber Corporation within 20 calendar days of <br /> the completion of field work. <br /> 1 <br /> OTHER TERMS AND CONDITIONS <br /> I� 1 <br /> li <br /> Enclosed is a copy of our standard terms and conditions (Attachment 3), which are <br />` incorporated in this proposal as if set forth in.full. This proposal will remain valid for <br /> 30 days. <br /> QUALIFICATIONS <br /> Clayton is an internationally recognized leader in the fields of environmental health <br /> and safety, and environmental engineering. Founded in Michigan in 1954, Clayton <br /> today has offices in Michigan, New Jersey, Georgia, California, Canada, and the . . <br /> United Kingdom. Our staff of more than 350 professionals includes certified industrial <br /> hygienists, geologists, hydrologists, chemists, computer scientists laboratoryanalysis <br /> � <br /> and regulatory experts. �If <br />
The URL can be used to link to this page
Your browser does not support the video tag.