Laserfiche WebLink
. 11 C— OIx <br /> ' ENVIRONMENTAL r <br /> CONSULTANTS <br /> Mr. William Rieger ! Page 4 ,: <br /> Fortifiber Corporation Gayton Proposal No. 93-B-110 <br /> April 6, 1993 <br /> A cost breakdown follows: <br /> Monilgring -W-&JJ Justallatignj{ <br /> • Clayton labor (geologist) ; $ 650 � <br /> • Vehicle 60 <br /> • Permitting costs 235 <br /> • Subcontractor (driller.) estimated 1,700 <br /> Y <br /> • Photoionization detector (PID) - per day 125 . <br /> Subtotal, Monitoring Well installation j� $ 2,774 <br /> Well Development and Sampling I <br /> Two site visits @ 260 per visit �I $520 <br /> Vehicle and sampling equipment ; 75 <br /> I� <br /> Subtotal Well Development and Sampling !i $595 <br /> Project Management and Report Development <br /> I� i <br /> • Project Management $ 380 <br /> • Report development !{ 520 <br /> Subtotal, Project Management/Report Development $ 9(10 <br /> lab <br /> Clayton estimates that the following analyses will be perf6lrmed. <br /> I} <br /> Soil (reported in milligrams per kilogram) l <br /> Two soil samples <br /> • EPA Method 8015 for total 2 analysis @ $100/each $ 200 <br /> petroleum hydrocarbons (TPH) <br /> as diesel <br /> • EPA Method 413.2'for TPH as 2 analysis @ $65/each .130 <br /> oil and grease <br /> • EPA Method 8020 for BTEX 2 analysis @ $90/each 180 <br /> • EPA Method 8315 for formaldehyde 2 analysis @ $230feach 460 <br /> Subtotal, Soil Analyses I $ 970 <br />