Laserfiche WebLink
I � � <br /> n <br /> i <br /> int <br /> ideal laboratory conditions with a maximum theoretical initial soil;vapor TPHg concentration of <br /> 222,000 mg/m3. One can see from this plot that if removal of 99%1 of the petroleum <br /> hydrocarbons requires, for example, 20 months, then the influent concentration will decline to <br /> less than 10% of the initial concentration within one month.I'Thus,'j�sizing an oxidizer for the high <br /> initial influent concentration may not be economical. It is considered prudent to size the oxidizer <br /> for the total well flow rate and initially operate erate at a reduced well flow rate. Thus, an oxidizer <br /> sized for 200 m3/hr(120 scfm) is appropriate. I; <br /> Typical standard oxidizer ratings are 100 scfm, 250 scfm, 500 scfm and 1,000 scfm. Oxidizers <br /> Ir i <br /> may be available which are sized for 255 m3/hr(l 50 scfm). If a used, but serviceable, oxidizer is <br /> available in the size range of 170 m3/hr(100 scfm) to 425 m3/hr(2 50 scfm), significant cost <br /> savings can be obtained. Outside this range, operating expenses increase significantly. Smaller <br /> units will increase the operating time and, consequently labor and sampling costs. Larger units <br /> will increase fuel costs. Therefore, a new 255 m3/hr (150 scfm) oxidizer or a used 170 in <br /> (100 scfm) to 425 M3/hr(250 scfm) oxidizer will be used, depending on availability. An oil-free <br /> air compressor will be used to supply the sparge air. S <br /> Figure 10 is a simplified Process Flow Diagram for the SVE,and air sparging systems. <br /> 4.2 Permits <br /> To complete the proposed remedial alternative for the site, the following permits are necessary j <br /> from regulatory agencies and organizations: , <br /> • San Joaquin County Public Health Services, Environmental Health Division—well permits. } <br /> • San Joaquin Valley Air Pollution Control District (APCD)—authority to construct permit, <br /> i� IR <br /> permit to operate, and soil and groundwater remediation supplemental application. <br /> 0 City of Stockton—building permit. �} <br /> 'F f <br /> 4.3 Construction <br /> A licensed well driller will install the proposed vapor extraction and air sparge wells. During the <br /> installation of the SVE wells, soil samples will be collected for analyses every 3 in (10 ft) <br /> starting at 4.6 m(15'ft) until total depth is achieved. See monitoring section for analyses. <br /> �r <br /> } <br /> &wDP-N ksac0nM0PRJIRl8IMWa28942ab.doe 4-2 <br /> M T0200W) 'i <br />