My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 9:57:21 AM
Creation date
2/5/2019 9:35:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k. <br /> • • pp�Qpp� <br /> Envirorimental Consultants Inc. <br /> ao <br /> GEO,�TECRNICAL ENGINEERING AND ENVIRON',MENTAL SCIENCES <br /> 1, <br /> 4 <br /> Project No. S8100-06-18 <br /> I <br /> June 19, 1996RE <br /> CEIVEDSan 7oaquin County Public Health Services 304IE. Weber Avenue, <br />' II <br /> 3rd Floor kJUN 2 01996 <br /> Stockton, California 95201-0388 I ENVIRONMENTAL HEALTH <br /> l <br /> Attention: Ms. Mary Meays PERMIT/ SERVICES <br /> Subject: CALTRANS SHOP 10 MAINTENANCE STATION.' <br /> 1603 SOUTH B STREET it <br /> STOCKTON, CALIFORNIA i <br /> TRANSMITTAL OF WELL PERMIT APPLICATIONS <br /> I� <br /> Dear Ms. Meays: I <br /> Enclosed is an Application for Well/Pump Permit for phase II site assessment work proposed at the <br /> Shop 10 facility. The proposed Phase II scope of work is summarized below and will be <br /> performed as described in the approved Workplan entitled"Site Assessment Workplan", dated June <br /> 21, 1995. <br /> Theproposed scope of work consists of advancing two soil borings to a:maximum depth of 60 feet <br /> below ground surface(bgs)utilizing a truck mounted,hollow-stem aug r drill rig and installing 2- <br /> inch'-diameter vapor extraction monitoring wells(VM-I and VM 2). The lower portion of the <br /> well's will be constructed using 45 feet of 0.020-inch slotted PVC casing. <br /> Existing monitoring well MW-11,which is blocked with debris,will be'extended to 80 feet bgs. A <br /> l 4-inch diameter groundwater monitoring well will be installed and the lower portion of the well will <br /> constructed using 25 feet of 0.020-inch slotted PVC casing. �g <br /> If you have any questions concerning the contents of this transmittal,please contact me at(916) <br /> 852-9118. I z <br /> i <br /> Very truly yours, <br /> GEOCON ENVIRONMENTAL CONSULTANTS <br /> f <br /> Ian P. Moorhead <br /> Project Geologist I� <br /> I <br /> Enclosures: Application for Well/Pump Permit I I <br /> Site Plan l+ <br /> + Well Permit Fees <br /> + j <br /> 3235 5urarise Blvd.,Suiie 6 <br /> Rancho Cordova,CA 95742 <br /> (916)652-9118 <br /> Fax(916)852-9132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.