Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act proactivelyto identifyand mitigate hazards to the safest extent of their ability. <br /> HERR-W. <br /> Set up necessary traffic Wear reflective traffic vest, Struck by vehicle during * Use buddy system for placing traffic control - STANTEC/Contractor <br /> control. steel toed and shank shoes, placement. Vehicle <br /> long sleeve shirt, hardhat. accident as a result of • Reference traffic control plan (See Attachment 2)- <br /> improper traffic control STANTEC/Contractor <br /> equipment placement. a It is the responsibility of the Supervisor 1 SHSO to annotate the <br /> Site Plan with the Traffic Control configuration if an Approved Traffic <br /> Control Plan is not available-STANTEC. <br /> Set up exclusion zone(s). Wear reflective traffic vest, Struck by vehicle. Slip and ` • Implement exclusion zone set-up instructions- <br /> steel toed and shank shoes, fall hazards to workers. STANTEC/Contractor. <br /> long sleeve shirt, hardhat. • It is the responsibility of the Supervisor/SHSO to annotate the site <br /> Plan with the Exclusion Zone configuration STANTEC. <br /> Set up clear walking paths between workstations- <br /> STANTEC/Contractor <br /> Gauge water levels and Don required PPE as Back strain, inhalation or • Initiate air quality monitoring in accordance with Section 12 - <br /> product thickness (where appropriate for this step: steel dermal exposure to STANTEC <br /> applicable) in wells. toed and shank shoes, long chemical hazards, • Have appropriate respirator with combination organic vapor/P-100 <br /> sleeve shirt, hardhat, safety repetitive motion cartridges within 3- 5 feet of working location, readily available- <br /> glasses with side shields, STANTEC/Contractor. <br /> hearing protection, reflective <br /> safety vest, leather gloves for • Maintain safe distance from wellhead-STANTEC/Contractor. <br /> Use proper lifting techniques-STANTEC/Contractor. <br /> work as necessary.Wear <br /> chemical resistant gloves__... •'Decontaminate-equipment between each measurement- <br /> during handling of soil:Wear an. STANTECIContractor. <br /> air-purifying respirator with <br /> combination organic vapor/P- <br /> 100 cartridges as necessary. <br /> STANTEC Consulting Corporation <br /> 13-13 <br />