Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act proactively to identify.and miti ate hazards to the safest extent of their ability. <br /> . . IBM <br /> 1! MEN <br /> Purge well(s) and collect Steel ffitoedand shan"shoes, Cros s-contamination. • Decontaminate purging equipment between each sampling <br /> purge water. Purging of the long sleeve shirt, hastrain, inhalation or location. (Disposable equipment decontam will be properly disposed <br /> wells can be done by using safety glasses with seermal exposure to of. Reusable equipment will be washed in an Liquinox wash, rinsed <br /> one of four methods, by shields, hearing protection, chemical hazards, slip and with tap water, then rinsed with a de-ionized or distilled water rinse. <br /> hand bailer, dedicated reflective safety vest, and `4 fall. Spilling contaminated Wash/rinse water will be transferred to 55-gallon drums and staged <br /> pump, a battery operated leather gloves for the non- water. out of way of vehicular traffic-STANTEC/Contractor. <br /> pump, or vacuum truck. If chemical aspects of work as <br /> a hand bailer, dedicated necessary. If you suspect that • Use proper lifting techniques STANTEC/Contractor. <br /> pump, or battery operated equipment is contaminated, <br /> pump is used (see below if wear chemical resistant gloves. • Perform air monitoring in accordance with Section 12 -STANTEC <br /> using a battery operated Wear appropriate air-purifying <br /> pump), collected water will respirator with combination • Have appropriate respirator with combination organic vapor/P-1 00 <br /> be transferred to 55-gallon organic vapor/P-100 cartridges cartridges within 3-5 feet of working location, readily available- <br /> drums. If the vacuum truck as needed:Wear appropriate . �' <br /> STANTEC/Contractor: <br /> is used there will be no chemical resistant suit as • Keep work area clear of tripping or slipping hazards- <br /> collected water. needed. <br /> F STANTEC/Contractor. <br /> • Store purge water in 55-gallon drums. . Drums will be staged out of <br /> way of,vehicular traffic-STANTEC/Contractor <br /> • Drums containing flammable/combustible liquids or solids must be <br /> grounded and if there are multiple drums bonded together <br /> ST_ANTECIContractor. <br /> • Use extreme care when opening the bung caps. Stand an arms <br /> length away and open the bung slowly to relieve any built up <br /> pressure- STANTEC/Contractor <br /> STANTEC Consulting Corporation <br /> 13-1.4 <br />