My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should actroactivel to identi and mitigate hazards to the safest extent of their ability- <br /> Store <br /> bili . <br /> Store purge water(if any) Steel toed and shank shoes, Back strain. Exposure to • Use proper equipment to transport water(pumps, drum dollies, <br /> onsite. hardhat, safety glasses with contaminants. If disposing etc). -STANTEC/Contractor. <br /> side shields, hearing protection, through onsite treatment • Have appropriate respirator with combination organic vapor P-100 <br /> reflective safety vest, and system, damage or injury cartridges within 3- 5 feet of working location, readily available- <br /> leather gloves for the non- from improper use of STANTEC/Contractor. <br /> chemical aspects of work as equipment. Improper • Label storage containers properly, and locate in isolated area away <br /> necessary. If you suspect that storage or disposal. from traffic and other site functions-STANTEC/Contractor. <br /> equipment is contaminated, <br /> wear chemical resistant gloves. • Coordinate offsite disposal (where applicable) -STANTEC. <br /> Wear appropriate air-purifying <br /> respirator with combination • Do not attempt to lift, push or move drums without the proper tools <br /> organic vapor 1 P-100 or equipment-STANTEC/Contractor. , : <br /> cartridges as needed.Wear <br /> appropriate chemical resistant • Store purge water in 55-gallon drums. Drums will be staged in a <br /> suit as needed. location determined by the SHSO and the Property Owner/Station <br /> Manager-STANTEC. x <br /> + Drums containing flammable/combustible liquids or solids must be <br /> grounded and if there are multiple drums bonded together- <br /> STANTEC. ' <br /> • Use extreme care when opening the bung caps. Stand an arms <br /> length away and open the bung slowly to relieve any built up <br /> pressure-STANTEC/Contractor. . <br /> Supervisor/SHSO must Steel toed and shank shoes, Possible injuries and •Visually inspect each and every boreholetmonitoring well- <br /> confirm all hardhat, safety glasses with damage to property due to STANTEC/Contractor. <br /> boreholes/monitoring wells side shields, hearing protection, stepping into or driving <br /> are closed, filled in and/or reflective safety vest, and over the well. <br /> capped. leather gloves for the non- <br /> chemical aspects of.work as <br /> necessary. - <br /> Perform personnel dry, Chemical exposure. • Perform dry boot wash using a stiff bristle, fiberglass handled <br /> decontamination brush paying special attention to the welt and sole areas of the boot. <br /> procedures. Put street shoes on. Wash hands, face arms and neck (any exposed <br /> skin) (use baby wipes if a washing facility is unavailable) <br /> Decontamination water will be stored in 55 gallon drums-STANTEC <br /> STANTEC Consulting Corporation. <br /> 13-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.