Laserfiche WebLink
Task 3. Utility clearance Job Safety Analysis (JSA) <br /> • Effm I <br /> 7DavidoltenbergAsst. Engineerllntern 10/24/2005 <br /> XPhilipp West Region Health and Safety 12/3/2003 <br /> Manager <br /> 10/24/2005 Michael Philipp West Region Health and Safety <br /> Manager <br /> Site specific edits to this JSA were made by 9/4/2009 Kimberly Wood <br /> If most recent review date is more than six months old, then this JSA musk be updated and reviewed again to remain current <br /> POC is the JSA development'Point Of Contact' <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain,.lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act proactively to identify and mitigate hazards to the safest extent of their abilit . <br /> . . • <br /> Mobilize with proper Gather necessary PPE. Vehicle accident. Lifting • Stark projectwith Daily Production Safety Meeting <br /> equipment/supplies for Reflective vest for traffic, steel hazards. Delay or STANTEC/Contractor. <br /> Utility Locating. toed and shank shoes, hardhat, improper performance of • Follow safe driving procedures. STANTEC/Contractor. <br /> safety glasses with side work due to improper <br /> shields, ear plugs/muffs, and equipment onsite. • Review permit conditions STANTEC. <br /> leather gloves. <br /> Perform Utility Locating, Wear reflective vest for traffic; Potentially can be struck • Adhere to approved traffic guidance and control plan <br /> marking utility locations steel toed and shank shoes, by vehicle during STANTEC/Contractor. <br /> with paint. hardhat, safety,glasses with placement. Vehicle • Use proper lifting techniques. STANTEC/Contractor. <br /> side shields, ear plugs/muffs accident as a result of <br /> and leather gloves as improper traffic control <br /> necessary. equipment placement. <br /> Muscle strains/sprains <br /> -from lifting equipment. <br /> Contact Underground Cut utility . Call underground utility locating service for public line location <br /> Services Alert clearance and get list of utilities being contacted. STANTEC. <br /> STANTEC Consulting Corporation <br /> a:, 13-20 <br />