My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
117777 r_7 r7-7 r77-r r-7 1177777 r-77 r7 F-77 1177_7 117_7 r= 117777 <br /> Task 4. Confirmation Soil Borings and Soil Sample Collection <br /> 7DiaMnneBurnia CHBU 1011212005seph Jordan National OE Coordinator 4/22/2007 <br /> X Michael Philipp West Region Health and Safety 10/12/2005 <br /> Manager <br /> 4/22/2007 Gary Sparks Project Geologist <br /> 9/4/2009 Kimberly Wood Assistant Scientist <br /> Site specific edits to this JSA were made by <br /> If most recent review date is more than six months old, then this JSA must be updated and reviewed again to remain current <br /> POC is the JSA development'Point Of Contact' <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act proactively to identify and mitigate hazards to the safest extent of their ability. <br /> MM ORION <br /> 7equipment <br /> conc •Verify records in possession are for equipment an site- <br /> maintenance maintenance, which can Stantec. <br /> or to... .,. _. cause-equipment failure •.Verify"maintenance is-current-Stantec:=== = <br /> commencing work. and possible personal <br /> injury. <br /> Visually clear proposed Wear reflective vest for traffic, Underground and • Complete Pre-Mobilization section of Utility Clearance Review form <br /> drilling locations. steel toed and shank shoes, overhead installations. (Attachment 4)and adjust drilling locations as necessary- <br /> long sleeve shirt, hardhat, Stantec/Contractor. <br /> safety glasses with side <br /> shields, and leather gloves as <br /> necessary. <br /> STANTEC Consulting Corporation <br /> 13-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.