Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act eroactively to identify and miti ate hazards to the safest extent of their abilit . <br /> MMStore purge water(if any} Steel toed and shank shoes, Back strain. Exposure to • Use proper equipment to transport water(pumps, drum dollies, <br /> onsite. long sleeve shirt, hardhat, contaminants. If disposing etc.). <br /> safety glasses with side through onsite treatment • Perform air monitoring as outlined in Section 11 - <br /> shields, hearing protection, system, damage or injury Stantec. <br /> reflective safety vest, and from improper use of • Have appropriate respirator with combination organic vapor/P-100 <br /> chemical resistant gloves as equipment. Improper cartridges within 3-5 feet of working location for quick access- <br /> necessary. Wear appropriate storage or disposal. Stantec/Contractor. <br /> air purifying respirator with • Label storage containers properly, and locate in isolated area away <br /> combination organic vapor/P- from traffic and other site functions- <br /> 100 cartridges as needed. Stantec/Contractor. <br /> • Coordinate offsite disposal (where applicable)- <br /> Stantec <br /> • Do not attempt to lift, push or move drums without the proper tools <br /> orequipment-Stantec/Contractor. <br /> Perform personnel dry Chemical exposure. • Perform dry boot wash using a stiff bristle, fiberglass handled <br /> decontamination brush paying special attention to the welt and sole areas of the boot. <br /> procedures. Wash hands, face arms and neck(any exposed skin) (use baby <br /> wipes if a washing facility is unavailable) Decontamination water will <br /> be stored in 55 gallon drums-Stantec. <br /> • Drums will be staged in a location determined by the SHSO and <br /> the Property OwngrlStation_Manager- <br /> Stantec. <br /> • Drums containing flammable/combustible liquids or solids must be <br /> grounded-and-if there-are-multiple-drums-bonded-together= 4W <br /> Stantec. <br /> • Use extreme care when opening the bung caps. Stand an arms <br /> length away and open the bung slowly to relieve any built up <br /> pressure-Stantec. <br /> Supervisor/SHSO must Possible injuries and • Visually inspect each and every borehole- <br /> confirm all boreholes are damage to property due to Stantec. <br /> closed, filled in and/or stepping into or driving <br /> capped over the well. <br /> STANTEC Consulting Corporation x <br /> 13-25 <br />