Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe-Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe. All employees <br /> should act proactively to identify and mitigate hazards to the safest extent of their abilit . <br /> Collect samples in Steel toed and shank shoes, Cross-contamination, • Evaluate any soil samples inside a Ziploc bag at arm's length. DO <br /> accordance with sampling long sleeve shirt, hardhat, improper labeling or NOT EVALUATE THE SAMPLE WITH THE BAG OPEN. THIS WILL <br /> plan. safety glasses with side storage, exposure to site AVOID UNNECESSARY EXPOSURE- <br /> shields, hearing protection, contaminants. Stantec. <br /> reflective safety vest, and • Decontaminate sampling equipment between each sampling run- <br /> leather gloves for the non- StanteclContractor. <br /> chemical aspects of:work as 4 •.Label samples in accordance with sampling plan <br /> necessary.Wear. appropriate Stantec. <br /> air purifying respirator with • Keep samples stored in proper containers, at correct temperature, <br /> combination organic vapor/P- and away from work area-Stantec. <br /> 100 cartridges if needed. • Conduct air monitoring as outlined in Section 12- <br /> Stantec.. <br /> Have appropriate respirator with combination organic vapor/P-1 00 <br /> cartridges within 3-5 feet of work area, readily available-. <br /> Stantec/Contractor.., <br /> Cuttings will be picked up Steel toed and shank shoes, Exposure to public. Traffic a Have proper storage containment and labeling available onsite. <br /> by shovel and placed long sleeve shirt, hardhat, hazard or Place materials in-isolated location away from traffic and.other site <br /> directly in 55-gallon drums. safety glasses with side obstruction/inconvenience functions. (See next section for Waste Description) <br /> shields, hearing protection, to station operation. Stantec. <br /> reflective safety vest, and Improper storage or • Do not attempt to lift,'push or move-drums without the proper tools <br /> leather gloves for the non- disposal. Back strain. and equipment-Stantec/Contractor. <br /> chemical aspects of work as • Conduct air monitoring as outlined in Section 12- <br /> necessary. If you suspect that Stantec. <br /> equipment is contaminated, • Have appropriate respirator with combination organic vaporlP-100 <br /> wear chemical resistant gloves. cartridges within 3=5 feet of work area, readily available- <br /> Wear appropriate air purifying Stantec/Contractor. <br /> respirator with combination <br /> organic vapor/P-1 00 cartridges <br /> as needed. <br /> - STANTEC Consulting Corporation <br /> 13-24 <br />