My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5. Installing temporary soil vapor probes at 3 locations. (JSA) <br /> David Stolcenberg Asst. Engineer/Intern 10/21/2005 <br /> X Michael Philipp West Region Health and Safety 8/4/2005 <br /> Manager <br /> 8/4/2005 Michael Philipp West Region Health and Safety <br /> Site specific edits to this JSA were made by 9/4/2008 Kimberly Wood Manager <br /> If most recent review date is more than six months old, then this JSA must be updated and reviewed again to remain current <br /> POC is the JSA development'Point Of Contact' <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act proactively to identify and miti ate hazards to the safest extent of their abili . <br /> f <br /> s , <br /> Obtain sub-contractor Improper equipment .Verify records in possession are for equipment on site. <br /> equipment maintenance maintenance, which can Stantec. <br /> records prior to cause equipment failure • Verify maintenance is current. Stantec. . <br /> commencing work. and possible personal <br /> jury <br /> Utility/Subsurface Selection of inappropriate • Clear and concise interactionwith field staff performing borehole <br /> in missed subsurface _must, and communicate findings-from„locate.and mark. . <br /> Impediment Clearance clearance method resulting clearance is.a <br /> services, utility locators and map research.. <br /> impediment, or could Stantec/Contractor. <br /> impact near-surface <br /> impediment with ruptured <br /> utility consequence <br /> a <br /> STANTEC Consulting Corporation <br /> 13-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.