My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field staff must review job-specific work plan and coordinate with project manager to,verify that all upfront logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute(PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act eroactively to identify and mitigate hazards to the safest extent of their abilit . <br /> m7 <br /> Mobilize with proper Gather necessary PPE. Vehicle accident. Lifting • Start project with Daily Production Safety Meeting <br /> equipment/supplies for Reflective vest for traffic, steel hazards. Delay or Stantec/Contractor. <br /> drilling. toed and shank shoes, hard improper performance of • Follow safe driving procedures. <br /> hat, safety glasses with side work due to improper Stantec/Contractor. <br /> shields, ear plugs/muffs, equipment onsite. • Employ safe lifting procedures.. <br /> leather gloves for the non- Stantec/Contractor. <br /> chemical aspects of work as • Makelsure sub-contractors are aware of their responsibilities for. <br /> necessary; Wear an air labor, equipment and supplies. Stantec. <br /> purifying respirator.with • Review permit conditions.Stantec. <br /> combination organic vapor/P- <br /> 100 cartridges, and other PPE <br /> as needed. <br /> Visually clear proposed Wear reflective vest for traffic, Underground and • Complete Pre-Mobilization section of Utility Clearance Review form <br /> drilling locations. steel toed and shank shoes, overhead installations. (Attachment 4) and adjust drilling locationsas necessary. <br /> hardhat, safety glasses with Stantec. <br /> side shields, and leather gloves �' y <br /> as necessary. <br /> Set up necessary traffic Wear reflective vest for traffic, - Struck by vehicle during • Use buddy system for placing traffic guidance and control " <br /> control for method of steel toed and shank shoes, placement..Vehicle equipment. Stantec/Contractor. ` <br /> borehole clearance a hardhat, safety glasses with accident as a result of : Implement traffic guidance and control plan such as setting out <br /> identified to be used (i,e. side shields, and leather gloves improper traffic guidance delineators, snow fence and caution tape defining safety arr <br /> ea. <br /> geophysical magnetic, as necessary. and control equipment. Stantec/Contractor. <br /> radar, air-knife, hydraulic placement. • Adhere to approved Traffic Guidance and Control Plans when <br /> excavations, etc.). working in roadways Stantec/Contractor. <br /> • It is the responsibility of the SHSO to annotate the Site Plan with <br /> the Traffic Guidance and Control configuration if a formally <br /> developed Traffic Guidance and Control Plan is not available. <br /> Stantec. <br /> ti STANTEC Consulting Corporation <br /> v y - 13.281 <br />
The URL can be used to link to this page
Your browser does not support the video tag.