Laserfiche WebLink
r r r r r r r r r r r r r r r r r r r <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act Droactively to ident'Ly and miti ate hazards to the safest extent of their abilit . <br /> . . Steps Personal Protective Potential <br /> 1pment <br /> Clean site/demobilize. Steel toed and shank shoes, Traffic. Safety hazard left • Use buddy system as necessary to remove traffic guidance and <br /> hardhat, safety glasses with on site. Lifting hazards. control equipment. StanteclContractor. <br /> side shields, hearing protection, • Leave site clean of refuse and debris. <br /> reflective safety vest, and StanteclContractor. <br /> leather gloves for the non- • Clearly mark/barricade any borings that need later topping off or <br /> chemical aspects of work as curing. StanteclContractor. <br /> necessary. • Notify site personnel of departure, final well locations and any <br /> cuttings/purge water left onsite. StanteclContractor. <br /> • Use proper lifting techniques StanteclContractor. <br /> STANTEC Consulting Corporation <br /> 13-31 <br />