My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r r r r r r r r r r r r r r r r r r <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act Droactively to ident'Ly and miti ate hazards to the safest extent of their abilit . <br /> . . Steps Personal Protective Potential <br /> 1pment <br /> Clean site/demobilize. Steel toed and shank shoes, Traffic. Safety hazard left • Use buddy system as necessary to remove traffic guidance and <br /> hardhat, safety glasses with on site. Lifting hazards. control equipment. StanteclContractor. <br /> side shields, hearing protection, • Leave site clean of refuse and debris. <br /> reflective safety vest, and StanteclContractor. <br /> leather gloves for the non- • Clearly mark/barricade any borings that need later topping off or <br /> chemical aspects of work as curing. StanteclContractor. <br /> necessary. • Notify site personnel of departure, final well locations and any <br /> cuttings/purge water left onsite. StanteclContractor. <br /> • Use proper lifting techniques StanteclContractor. <br /> STANTEC Consulting Corporation <br /> 13-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.