Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe.Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions.or behaviors are considered_ unsafe.All employees <br /> should act eroactively to ide tifv and miticiate hazards to the safest extent of their abilit . .: <br /> no 7contamination, <br /> Perform leak check of Steel toed and shank shoes, in, slip, trip and • Encompass sampling probe, sampling train, and sampling <br /> sampling equipment using hardhat, safety glasses withds, cross- container with shroud(s)and seal. Stantec.helium side shields, hearing protectioexposure to • introduce helium around the equipment into the shroud at 1-2 psi. <br /> reflective safety vest, and site contaminants Stantec. - <br /> leather gloves for the non- • Purge and leak check by collecting samples in a 1 L Tedlar bag <br /> chemical aspects of work as prior to collecting sample. Stantec. <br /> necessary. Wear appropriate • If helium tracer concentration is less,than 10%, sample collection <br /> air purifying respirator with may proceed. Stantec. <br /> combination organic vapor/P- <br /> 100 cartrid es if needed. <br /> Collect vapor samples in Steel toed and shank shoes, Cross-contamination, • Decontaminate sampling equipment(if necessary) between each <br /> accordance with sampling hardhat, safety glasses with improper labeling or sampling run. Label samples in accordance with sampling plan.. <br /> plan. side shields, hearing protection, storage, exposure to site Stantec. t <br /> reflective safety vest, and contaminants .e Keep samples stored in proper containers, at correct temperature, <br /> leather gloves for-the non- and away from work area. Stantec. <br /> chemical aspects of work as a • Conduct air monitoring Stantec. - <br /> necessary:Wear appropriate • Have appropriate respirator with combination organic vapor/P-1 00 <br /> air purifying respirator with w" <br /> �.. � t cartridges within 3-5 feet of work area, readily available. <br /> combination organic vapor/P- <br /> s if needed. StanteclContractor. <br /> 100 cartridge <br /> Construct temporary wells. Steel toed and shank shoes, Back strain, eye Injury, • Use proper lifting techniques. StanteclContractor, <br /> hardhat, safety glasses with slip, trip and fall hazards. . Keep pathways from well supplies to borehole clear of tripping <br /> side shields, hearing protection, Cross-contamination. hazards. Stantec/Contractor. <br /> reflective safety vest, and Non-approved well • Make sure materials are clean before going into borehole. <br /> leather gloves for the non- construction. Stantec/Contractor. <br /> chemical aspects of work as <br /> necessary. - <br /> Supervisor/SHSO must Possible injuries and .Visually inspect each and every borehole. <br /> confirm all boreholes are damage to property due to Stantec. <br /> closed,filled in and/or stepping into or driving <br /> capped. over the well. <br /> .0 <br /> STANTEC Consulting Corporation <br /> ` 13-30 <br />