My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> .JOURNEY MANAGEMENT PLAN(s) � <br /> 4 ' <br /> PURPOSE 1 L <br /> The purpose of this Journey Management Procedure (JMP) is to prevent losses associated with motor <br /> vehicle related incidents including: injuries to drivers, passengers and pedestrians, damage to motor <br /> vehicles and damage to third party property. By communicating potential safety risks before <br /> mobilizing to a site, a motor vehicle operator will be able to prepare for and avoid potential hazards. <br /> SCOPEI <br /> This JMP applies to all vehicles assigned for the support of site operations, including company owned <br /> and personal use vehicles. This JMP does not apply to vendors (such as UPS, FedEx. etc.) not under <br /> contract with STANTEC or their supplier. This JMP does not address hazards that are external to the <br /> site access/egress and on the onsite project operations. <br /> SPECIAL NOTE <br /> Because the site, weather and traffic conditions may change frequently the JMP shall be maintained <br /> and updated separate from the Site Health and Safety Pian. ► <br /> Responsibilities <br /> Contract Project Mana4er <br /> The contract project manager is responsible to ensure that the site has a current Journey <br /> Management Plan. <br /> Field Manager . . <br /> I I. <br /> The field manager is responsible to create and keep current a JMP that is appropriate for the site F <br /> conditions. It is also the field manager's role to ensure each vehicle operator has a JMP that <br /> describes the conditions for his vehicle and equipment prior to mobilizing to the site. A common JMP j <br /> may be used for several vehicles.or as conditions dictate a separate JMP may be specific or unique to <br /> 4 an individual vehicle. <br /> Vehicle Operator <br /> The assigned vehicle operator shall not mobilize to the site without first receiving the JMP. it is also <br /> the vehicle operator's responsibility to read and become familiar with the description and stipulations f ! <br /> of the JMP prior to mobilizing to the site. DO NOT mobilize to the site to get clarification to the JMP. ! <br /> Because driving conditions may vary, vehicle operators shall also notify the field manager of any <br /> hazards not identified on the JMP so that the field manager can update the JMP. Because traffic + <br /> conditions may change frequently on a project, the JMP shall be maintained and updated separate <br /> from the Site Health and Safety Plan. <br /> 1 <br /> i <br /> Attachment 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.