Laserfiche WebLink
(J) <br /> 1.0 INTRODUCTION <br /> This Health and Safety Plan (HSP) is a compilation of health and safety guidelines, p olicies and/or <br /> performance protocols that,when exercised, are intended to reducelor eliminate the potential for injury <br /> and exposure during the performance of the activities at the site described below. Conformance with its <br /> contents does not warrant that injuries or exposures will not occur. <br /> 13 , <br /> I <br /> This HSP is not a training too] and does not contain the degree of detail necessary to train an employee <br /> on the appropriate performance, approach and/or equipment-use protocols referenced, herein. Persons <br /> 11 1 <br /> working on this project and referring to this HSP shall meet tlie minimum training requirements <br /> described in Section 2.2. <br /> This HSP has been prepared to specifically support the field activities described herein. The provisions <br /> described herein apply to employees of Geocon Consultants, Inc. (Geocon) and its subcontractors, <br /> only. Representatives of the Client, Client-retained subcontractors,and representatives of state or local <br /> government agencies are expected to observe the safety rules and requirements established by their <br /> respective organizations,provided they do not conflict with this HSP. <br /> The contents of this HSP are based on factors and conditions understood prior to the start of the field <br /> activities. If those factors and conditions change during the performance of the activities, including the <br /> service scope, or if conditions exist that were not considered in the:preparation of this HSP, then such <br /> shall be brought to the immediate attention of the person approving this HSP,.and the HSP shall be <br /> modified, accordingly. The date indicated in Section 8.0 of this document indicates the latest version of <br /> this HSP. <br /> All project personnel, including Caltrans field inspectors will review, and become familiar with the <br /> II �� <br /> elements of the Pian prior to site work. A copy of the Plan will be provided to all subcontractors and <br /> the Caltrans Resident Engineer(RE) or designee involved with project activities. <br /> A pre job conference will be held to delineate roles and responsibilities, discuss key elements of the <br /> Plan, and coordinate activities. This Plan is a "working document',' to be`used by affected personnel. <br /> The Plan may be modified at any time in accordance with Section-.1.4 to adequately address changing <br /> conditions or previously unrecognized exposure hazards which mays be encountered during the project. <br /> An updated,current copy of the Plan will be maintained at the project site during and be available to all <br /> affected personnel. The date indicated in the lower right-hand coiner of,this document indicates the <br /> latest version of this Plan. I�. <br /> 4 1.1 Project Location and Description - <br /> Site Location: Shop 10 Maintenance Station, 1603 B Street <br /> Stockton, San Joaquin County,California <br /> Shop 10 MS,Task Order No.94 Caltrans Contract No,06A 1 141,EA 43-910076 <br /> Project No. 59200-06-94 - - July 2010 <br /> M <br />