Laserfiche WebLink
i � r <br /> At a minimum, all personnel will wash with soap and water before lunch, using the restroom, and <br /> at the end.of work. The face and hands shall be washed before eating, drinking, smoking, chewing <br /> gum, applying cosmetics,etc. . <br /> • Over-the-counter drugs and prescription medications must be reported to the'SSO for clearance <br /> before an employee is allowed to work near drill rig or other heavy equipment. . <br /> When portable electric tools and equipment are used,.three-wire_extension cords are required. <br /> Employees will advise their supervisors of any malfunctioning equipment immediately. <br /> An ongoing safety maintenance program for tools and equipment will be instituted. 'Inspections <br /> will occur on a regular basis to ensure parts are secure and intact. Defective equipment will be <br /> repaired or replaced. ` ' . ; <br /> + Appropriate engineering controls and equipment guards will be installed on tools and equipment. <br /> This includes seat belts&backup warning lights and signals. <br /> • A list of names of personnel who are trained in CPR and first aid shall be available. <br /> • Labels shall be placed on containers of hazardous materials. <br /> No one will work alone;the"buddy system"- shall be implemented for all field work. <br /> • Employees shall be trained to identify effects and symptoms of toxic exposure and report them <br /> immediately. ` <br /> Under no circumstances are Geocon staff to enter a permit-required confined space. <br /> 5.0 PERSONAL PROTECTIVE EQUIPMENT <br /> I <br /> The employment of the aforementioned engineering controls'is the preferred method of providing <br /> personal protection'from hazards identified at this and any site. PPE provides acceptable secondary' <br /> recourse, but only'when engineering controls fail or cannot adequately eliminate` exposure to the <br /> hazard. The use of PPE is intended to provide protection for onsite personnel from operational hazards <br /> that cannot be controlled through other safety procedures or work practices, 1 <br /> PPE required to be onsite for each worker during this project will include: <br /> ® Hard Hat(without face Shield) Safety Glasses <br /> ® Leather/Synthetic Safety Boots/Shoe ❑ Disposable inner gloves(for sample handling) <br /> ❑ Chem. Resistant Boots ❑ Chem. Resistant gloves <br /> ® Leather/Synthetic Work Gloves ❑ Air-Purifying Respirator <br /> ® Hearing Protection-Ear Plugs/Muffs ❑ 'APR Cartridges <br /> ® ANSI Approved Safety Vest e ❑ ,., Tyvek coveralls <br /> ❑ Other <br /> Only ANSI approved.PPE and NIOSH approved respirators will be assigned for use. The use • <br /> applications for this equipment are summarized in the following matrix. Specific procedures are further <br /> described below. <br /> Shop 10 MS,Task Order No.94 - Caltrans Contract No.06A1141,EA 43-910076 <br /> Project No. 59200-06-94 -12- July 2010 <br />