Laserfiche WebLink
3.0 SCOPE OF WORK <br /> The scope of this project is to: <br /> • Quarterly depth-to-water(DTW) measurements and groundwater sampling of 12 on-site wells for hydrocarbons and bloparameters <br /> • Conduct utility clearance in the vicinity of proposed confirmation borings and temporary soil vapor sampling wells <br /> • Conduct two confirmation borings and collect soil samples <br /> • Install three temporary soil vapor sampling wells and collect vapor samples <br /> This HASP was prepared for the use of Stantec personnel while performing the following tasks: <br /> 1. Driving to/from the job Site <br /> 2. Groundwater depth-to-water(DTW)and groundwater sampling <br /> 3. Performing utility clearance <br /> 4. Confirmation Borings and soil sample collection <br /> 5. Temporary soil vapor sampling wells and vapor sample collection <br /> A general site map is included in Attachment 2. <br /> R <br /> d <br /> M <br /> STA NTE C.Consulting Corporation <br /> 3-1 <br />