Laserfiche WebLink
♦ It is the responsibility of the SHSO to annotate the Site Plan with the Traffic Guidance and Control configuration if a "formally <br /> developed" Traffic Guidance and Control Plan is not available. It is also the responsibility of the SHSO to disseminate.the Traffic <br /> Guidance and Control information to all site personnel during the Daily Production Safety Meeting and any other time as necessary. <br /> Work on this project will be conducted during the hours: Start: 6:00 AM End: 6:00 PM Monday -- Friday <br /> Daily Production Safety Meeting <br /> A safety meeting will be conducted in the morning on each working day on the site to discuss the health and safety issues for the activities to be <br /> conducted that day. The topics of the meeting will include, at a minimum, general health and safety procedures, reviewing heath and safety <br /> policies and,reviewing the job hazard .analyses for the tasks to be conducted. Additional safety meetings may be conducted if the scope of work <br /> changes during the day, or if other health and safety issues are identified. Suggested meeting topics and daily meeting log sheets are included in <br /> Attachment 11. 3 , <br /> Hazard Communication <br /> All employees at the Site must review this site wide-HASP prior to field activities: The information in the JSAs and the attached data sheets is made <br /> available to all employees who could be affected by it prior to the time they begin their work activities. Modifications to JSAs and the accompanying <br /> data sheets. are communicated during routine briefings. Consistent with OSHA regulations, STANTEC must also inform other contractors and <br /> subcontractors about the nature and level of hazardous substances at this site, and the likely degree of exposure to workers who participate in site <br /> operations. <br /> Evacuation Information <br /> Randomly ilscheduled evacuation drills may be conducted at any time during field activities. Employees should follow emergency procedures outlined <br /> in Section 4+of this HASP and discussed during the day's daily production safety meeting. <br /> Shutoff valves/switches for utilities and products: It is the responsibility of the SHSO to annotate the Site Plan with the location of all shutoff <br /> valves and switches and to disseminate that information to all site personnel during the Daily Production Safety Meeting and any other time <br /> as necessary. <br /> Personal Protective EQuiiment <br /> The site-specific Personal Protective Equipment (PPE) ensembles and materials are identified in the Job Safety Analysis (JSA) sheets located later in <br /> this section. The PPE ensembles listed in each JSA has been identified as appropriate to protect the worker for the task addressed. The PPE <br /> ensembles are consistent with Appendix B of 29 CFR 1910.120. PPE is to be used in accordance with manufacturers' recommendations. <br /> Personal Safety Concerns and Precautions: "There are no other safety concerns associated with this site other than those normally <br /> encountered on a hazardous waste site." <br /> STANTEC consulting Corporation <br /> 13-2 <br />