My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000195
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:10:43 AM
Creation date
2/5/2019 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000195
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
investigation and remedial planning study. The tasks of this <br /> investigation inglude the following: <br /> Task A: Acquire Permits <br /> Alton Geoscience will procure all necessary permits, <br /> schedule field activities, and locate underground <br /> utility lines prior to commencement of field work. <br /> Task B: Install Exploratory Soil Borings, and Ground Water <br /> Monitoring wells <br /> To further assess the lateral and vertical extent of <br /> petroleum hydrocarbons in the soil and ground water, <br /> five soil borings will be drilled to minimum total <br /> depths of 70 fbg. Three soil borings will be <br /> converted into monitoring wells. Soil borings will be <br /> drilled using a truck mounted CME-75 drilling rig <br /> with 10-inch-diameter hollow-stem augers. The <br /> proposed soil borings and monitoring well locations <br /> are shown on Figure 2, Site Plan. The exact boring <br /> locations will be determined following communication <br /> with the SJCEHD and underground utilities location <br /> search and may vary depending on actual field <br /> conditions. <br /> Procedures for drilling and soil sampling will be in <br /> accordance with the technical specifications and <br /> applicable requirements and guidelines of the <br /> regulatory agencies. Prior to drilling, each <br /> borehole location will be surveyed by a private <br /> utility search. Additionally, each boring will be <br /> manually excavated to a minimum depth of 4 fbg. <br /> Diameter of the manually excavated borings will be <br /> at least it inches. General procedures for drilling, <br /> soil sampling, and monitoring well construction are <br /> included in Appendix A. <br /> Task C: Develop. Sample, and Survey,..Ground Water, <br /> Monitoring Wells <br /> New monitoring wells will be developed and sampled in <br /> accordance with the technical specifications and <br /> applicable requirements and guidelines of SJCEHD and <br /> the RWQCB. Following development, all monitoring wells <br /> be purged and sampled. General monitoring well <br /> development, sampling, and surveying procedures are <br /> included in Appendix A. <br /> Task D: Analyze Soil and .Ground Water Samples <br /> All soil and water samples will be transported to a <br /> California-certified laboratory for analysis <br /> following proper chain of custody procedures. Select <br />
The URL can be used to link to this page
Your browser does not support the video tag.