My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000198
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
ARCHIVED REPORTS XR0000198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:12:55 AM
Creation date
2/5/2019 10:02:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000198
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract No. 53U495 <br /> Task Order No 10-365101-01 <br /> Page 4 <br /> C. Conduct the Site investigation <br /> The contractor shall implement the approved workplan at the worksite The <br /> contractor is responsible for making arrangements for providing all labor, <br /> equipment and materials necessary to perform the required drilling, <br /> augering, trenching, sampling and laboratory analysis elements Sample <br /> analysis for organics shall be performed by a state certified laboratory <br /> The contractor shall ensure that the laboratory follows the QA/QC protocols <br /> as required by Contract 535515 The following anlytical methods are to be <br /> used to analyze the samples for the contaminants of concern <br /> EPA 8015 modified for gasoline <br /> EPA 8020 for BTX& E <br /> EPA 8010 for Halo Hydrocarbons <br /> EPA 418 1 for oil and grease <br /> EPA 8080 FOR PBCs <br /> Conditions found during the field sampling and analysis may dictate a <br /> change in the investigation level and increase or decrease the quantity and <br /> Iocations of sampling <br /> Field work will be conducted within the limits of an operating maintenance <br /> station and work will have to be conducted accordingly Work locations <br /> within the heavy use areas of maintenance crews may require restoration <br /> work to occur on an on-going basis to insure minimal interruption to use of <br /> the facilities <br /> D Reporting of Investigation Work <br /> The contractor shall report all work done in accordance with the provisions <br /> for Site Investigation Reports and Remedial Action Options of Contract <br /> 53S515 The remedial action option for this report shall be as described on <br /> page 13 and 14 of contract 535515 <br /> III ESTIMATED COST OF WORK <br /> The estimated cost of this TO is developed for accounting and budget <br /> purposesonly The contractor will only be paid for items and quantities <br /> actually performed Additional work or changes in an item or quanitity must <br /> be preapproved by the contract manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.