Laserfiche WebLink
�I-X I Ell E I I <br /> 8720033A-COT-5 <br /> Appendix A. Soil samples were recovered <br /> are above the sample interval <br /> soils encountered augers to at point immediately clean brass liner tubes - <br /> by advancing ler with <br /> and then driving a modified California Sampler <br /> auger stem. The sampler was then winched out of the <br /> through the hollow with aluminum foil and <br /> and the sample tubes removed and sealed tubes in each <br /> auger string the second of the three sample <br /> ' plastic end caps, Generally The soil samples were <br /> interval was retained for ironmental laboratory under Chain- Custody-Cus�heysoil <br /> les for analysis by WCC, <br /> delivered to the WCC en <br /> control After removal of soil subsamp control to California <br /> The completed Chain-of- <br /> w samples were transmittf�rundyan caleadf-Custodyanalysis. visually <br /> Anlaytical Laboratory Appendix 8. soil samples were <br /> Custody forms are included in App <br /> -~ field for stains and checked for odors. An <br /> no panic <br /> inspected in the <br /> jar, shaken, and the <br /> ' photoionization detector Was esswereosealed incheck ia dam ors. Many <br /> vapors, Selected soils P organice for vapors, <br /> ac <br /> prlotoionizer probe used to check tdistin t Hydrocarbon odor or yielded a <br /> soil samples were found to have a <br /> n tested with a pkjotoionixation detector <br /> non-zero reading whe . <br /> Monitorin Wells oil at the <br /> wells were constructed in th' s ructedgwith '-inch <br /> Groundwater monitoring The g perforated with ' <br /> r <br /> completion of drilling. groundwater wells were <br /> comp lengths of well str�.en P , <br /> elow <br /> diameter PVC pipe, with 20 foot leng <br /> s extending from 28.5 to 30 feet to hand �ae50alleofbthe <br /> ,020-inch slot slotted pipe 3 to 4 feet <br /> grade. The annular space between the sand to approxi-wately <br /> 'ed with Nn. 3 Monterey }u was placed <br /> boring was hackfil , to 2-foot bentonite Plug <br /> ace from the top of the bentonite plug <br /> above the perforated section. <br /> Th iannu}erlsp The wells were <br /> above the sand pack• ; ,��at Cement grout, <br /> to the ground surface wGS eclat thetsurface. <br /> completed with locking box <br /> 'A� <br />