Laserfiche WebLink
Compound Piping <br /> Pipe, pipefittings and other incidental related items as required for complete piping systems to and <br /> from the remediation system shall be as follows: <br /> • 1-inch-diameter Schedule 40 PVC shall be used for sampling ports <br /> • 2-inch-diameter Schedule 40 PVC shall be used as individual AS line risers and"bleed in"lines <br /> • 4-inch-diameter Schedule 40 PVC shall be used as individual SVE line risers <br /> • 2- or 4-inch-diameter Schedule 40 PVC shall be used throughout the remainder of the compound <br /> (equipment connections and main header line) <br /> • Appropriate reducers and applicable Schedule 40 PVC fittings shall be used to connect all piping <br /> • Tracer wire shall be placed in each newly installed trench for the purpose of locating nonmetallic <br /> piping networks installed in trenches <br /> Knockout Tank <br /> The liquid/vapor separator shall be equipped with a "high" float sensor installed in accordance with <br /> the recommended procedures supplied with the sensor and knockout tank. An auto pump-out system <br /> with a 0.5-HP, single-phase motor shall be used to pump the water into a 385-gallon poly tank. <br /> Electrical System <br /> The electrical system to the remediation equipment compound shall consist of the following: <br /> • Conduit and conduit fittings to be buried underground shall have an inside diameter not smaller <br /> than 3/4-inch-diameter <br /> • Exposed conduit runs shall be rigid, galvanized steel or code-approved PVC conduit <br /> • Empty conduit systems shall consist of conduits,junction boxes, plates, identification tags, fittings <br /> and support devices; empty conduit systems shall-be free from debris prior to final acceptance of <br /> the work <br /> System Compound <br /> • The remediation system compound shall be approximately 20 feet by 30 feet and enclosed by new <br /> chain-link fencing on the east and south sides, and the existing chain-link fence on the other sides. <br /> An 8-foot, center-locking .gate shall be centered in the new chain-link fencing installed on the <br /> southern end of the compound <br /> • Height of the new fence posts shall be approximately 7 feet and topped with three strands of <br /> barbed wire; fencing shall contain suitable security covers or slats <br /> • Four-inch-diameter iron pipe security bollards shall be placed on 4-foot centers along the southern <br /> sides of the compound and secured 3 feet deep in concrete cement. Removal bollards shall be k <br /> placed in front of the gate <br /> i <br /> l <br /> Stockton Maintenance Station,Task Order No.05 Caltrans Contract No.06A1 141,EA 10-ON8300 <br /> Project No.S9200-06-05A - 8- December 28,2010 <br /> 1 <br />