ameO <br /> mass. A portable helium detector(Marks Product helium detector or equivalent)will be used <br /> to detect the presence of helium in the observation wells throughout the constant rate test. <br /> The meter will be factory calibrated and field checks will be performed with helium standards <br /> to verify the instrument is operating properly. Vapor.samples will be collected in TedlarTM bags <br /> r using a vacuum pump or syringe and the helium:detector will be attached directly to the bag <br /> t� for measurement. The monitoring frequency for helium is described in Table 2. <br /> 5.0 REPORTING <br /> Following receipt of analytical data, AMEC will prepare a report to summarize the field <br /> activities and present results from the Site investigation and AS pilot test. At a minimum, the <br /> investigation and air sparging pilot test report will include: <br /> • A written description of field activities; <br /> • A scaled map of the Site showing locations of new wells, former UST systems, <br /> excavation locations, existing monitoring wells, subsurface utilities, buildings, and <br /> streets; <br /> • A map showing the estimated extent of petroleum hydrocarbon impacts in the <br /> source area; <br /> • Soil boring logs, MIP results, and well installation logs; <br /> • Pilot scale analytical data presented in tabulated form; <br /> • Plots of air injection pressure verses flow`rate from the AS pilot test; <br /> • Plots showing the change in water elevation, DO concentration, ORP, helium <br /> concentration, and PID readings in the observation wells; <br /> • A discussion regarding the effectiveness of AS at the Site and an estimation of AS <br /> design parameters (optimal injection pressure and flow rate, ROI, groundwater <br /> mounding transition time); and <br /> • Recommendations for future work at the Site. <br /> 6.0 SCHEDULE <br /> AMEC will initiate the scope of work summarized above upon receipt of SJCEHD approval of <br /> this work plan. Due to Caltrans funding, the work must be completed on an expedited <br /> schedule: <br /> • The pre-field activities will be completed by March 26, 2010. <br /> AMEC Geomatrix, Inc. <br /> P:\Project\14000s\14443_Caltrans\TO 10\11000_PLANSWS WP_March 2010\AS WP.doc 14 <br /> i� <br />